Upendra_QE&A_GC

57 %
43 %
Information about Upendra_QE&A_GC

Published on July 14, 2016

Author: UpendraMogilicherla

Source: slideshare.net

1. Full Name : Upendra V Mogilicherla Preferred Name: Upendra Mobile: 434-329-9307 Visa Status: Permanent Resident(GC) Location: Morrisville, NC Email :upendra_m79@yahoo.com Achievements: • Got AIC Club (Best performer) award in SATYAM for the year 2007-2008. • Got Kohinoor award in Invensys project for the year 2011-2012. • Got exceptional performer for architect role in Walgreen for the Month Feb’2014 • Got exceptional award for Test analyst role in BBandT for the year 2015-2016 Certifications: • PMP certified from PMI • Load runner certified from HP EDUCATION Title of the Degree with Branch College/University Year of Passing Master of Computer Applications Nagarjuna university 2003 Experience Summary: • Twelve years of experience in Software Testing and One year experience in development (.Net) • Experience in Quality Assurance, Performance Testing (Front and Back end) & Automation • Proficient in implementation of automation software, testing (functional, acceptance, browser compatibility,PEGA,Mobile,compatibility,Mainframe,Hardware(ATM),Database,load,volume and capacity) and development to high quality assurance standards • Broad knowledge in full Software Development life cycle - Analysis, Design, Development, Build/Release, Testing, Integration and Deployment and Test Methodologies. • Excellent working knowledge on Test Management Tools like TFS,clear case and Defect Tracking Tools like Onyx,clearquest, Quality center 9.1, • Excellent working knowledge on SOAP protocol, Oracle (2 tier) protocol, SAP-Web protocol and Web (HTTP/HTML) protocol by using Mercury Load Runner. • Excellent working knowledge on Monitoring tools like Site Scope 7.8 and Precise/Indepth. • Experience in developing Test Strategies, Test Plans, Test Cases and Test Scripts • Adequate Experience in Requirement Analysis and Effort Estimation • Ability to prioritize along critical path and meet project milestones and deliverable dates • Ability to understand and translate business requirements and to operate independently or in a team environment. • Strong Project Management and organization skills • Proven ability to manage multiple projects, under tight deadlines, often with competing priorities and complexities • Ability to develop and maintain strong working relationships • Conducted Corporate Training on Performance testing Tools (Mercury) • Received Performance recognition awards from various clients/companies • Having Onsite experience in South Africa, USA for clients BB&T ,FIFA-Match,JP Morgan and Harris assignments and offshore coordinator for Citi group project.

2. Full Name : Upendra V Mogilicherla Preferred Name: Upendra Mobile: 434-329-9307 Visa Status: Permanent Resident(GC) Location: Morrisville, NC Email :upendra_m79@yahoo.com TECHNICAL SKILLS: Operating Systems: Unix, Windows XP/2000/NT/98/95, UNIX Flavors (HP Unix and Solaris) Programming Languages C, C++ Software Automation Tools WinRunner, Mercury Load Runner, Quick Test Professional, WWFAST. RDBMS: DB2, Oracle 7.x/8i, SQL Server, MS Access, TOAD Monitoring Tools: Site Scope, Precise/Indepth, Mercury J2EE Transaction Breakdown Methodologies Object Oriented Methodologies Middleware Tested IIS,JCAPS Web/Application Server IBM Web Sphere, Weblogic-8,Sun one , MS-Internet Information Server 4.0, Apache RDBMS: DB2, Oracle 7.x/8i, SQL Server, MS Access, TOAD Monitoring Tools: Site Scope, Precise/In-depth Test Management and defect tracking Tools Onyx-4.5, ALM,Clear quest- 7.0,TFS Versioning Tools Clear Case 7.0 Testing methodology Agile methodology. V-Model Internet Technologies HTML 4.0, JavaScript, VBScript, ASP, Java, JDBC, Servlets, JSP, EJB, Applets, XML, Web Services, SOAP Relevant Project Experience Project #1 CLIENT BB&T (www.bbt.com) LOCATION Raleigh– USA DURATION Jun ‘14 – till date ROLE Test manager TOOL ALM, TFS Environment

3. Full Name : Upendra V Mogilicherla Preferred Name: Upendra Mobile: 434-329-9307 Visa Status: Permanent Resident(GC) Location: Morrisville, NC Email :upendra_m79@yahoo.com PROJECT DESCRIPTION: This is the Online Banking Project that provides Services in different areas like Bill Payment, Funds Transfer, and Investment Services. The project also deals with the Security feature, making the Customers of the Bank more confident. The Security is maintained with SMS OTP. SMS OTP is One Time Password sent to Customer through SMS, for specific transactions like Adding of Payee, Funds Transfer and Bill Payment. The application also deals with Merchant payment, Cheque and DD mailing to Customer's address making the client enjoy the luxury of getting the cheques and DD’s at doorstep. Roles and responsibilities: • Lead Quality Assurance/Testing for a defined area of responsibility to successfully and consistently deliver high-quality software products and services on time, on budget, and to specification. Interact with Product Management, Project Management, Engineering, and Operations teams to plan delivery of products and enhancements and to assure products meet requirements and quality standards. • Involving the review of sow, test plan and test design • Preparing the test plan, estimations for ongoing and new projects • Preparation of Test Estimation, Test strategy, Test Plan and Release summary report. • Identified Test requirements and checked if the test cases were complete enough to test the Business functionality • Preparation of the Test Data sheet and seeing to that the data is properly set-up • Defect Tracking with TFS,ALM • Performed and suggestions to different testing teams like Mobile testing (Android and Apple devices), Sanity testing, Functional testing, Usability testing, User interface testing, Cross browser testing, Regression testing and Performance testing. • Having good experience on BB&T proprietary tools like IDM clarity ,Change point Profile Manager, CSS,latency tool and cognizant proprietary tools like ADPART,cognizant 2.0, QSMART,risk portal,QPM. • Publishing daily status reports during execution.. • Implement processes that enable efficient delivery and maintenance. • Balance deployment of resources within group as necessary to support priorities. • Identify opportunities for automation or other utilities and work within the framework of the QA/Test team to fulfill these needs. • Implement and cooperate in the enhancement of the methodologies employed for test planning and execution, defect tracking, and metric and status reporting. • Manage continuous improvement initiatives and implementation of best practices.

4. Full Name : Upendra V Mogilicherla Preferred Name: Upendra Mobile: 434-329-9307 Visa Status: Permanent Resident(GC) Location: Morrisville, NC Email :upendra_m79@yahoo.com • Identify areas for cooperation and, with peers or others, implement initiatives improving overall capability and efficiency. • Lead or participate in initiatives to identify and implement tools and utilities that enhance testing capabilities and product quality. • Work with QA/Testing staff, project managers, technical leads, and subject matter experts to plan and execute automated and performance tests. • Ensure that testing addresses requirements as agreed with other stakeholders. • Work with architects, developers, and network and system engineers to research and identify root causes of performance issues. • Serve as subject matter expert in the configuration, maintenance, and/or administration of testing tools or environments. • Suggest process improvements that enable efficient delivery and maintenance with consistent direction. • Maintain flexibility to react quickly to changes in priorities or circumstances to meet the needs of the business. • Report issues and results, researching and identifying root causes as appropriate, documenting accordingly. • Maintain awareness of the state of the industry and evaluate emerging trends/developments that may benefit the organization. • Conduct project reviews, ensuring review criteria are defined, and implement procedures for ensuring quality control of project deliverables. • Carry out management responsibilities in accordance with the organization's policies, procedures, and applicable laws. Responsibilities include interviewing, hiring, and training employees; planning, assigning, and directing work; appraising performance; rewarding and disciplining employees; and addressing complaints and resolving problems. • Ensure all staff is provided with training and resources needed to perform their jobs to the most outstanding degree possible. Ensure all staff is provided with frequent feedback and coaching in order to meet and exceed individual and team performance goals consistently. • Manage and encourage new ideas from staff to foster improvements through innovations. • Empower the staff to be accountable and responsible for their own actions and decisions. • All other duties as assigned. Project #2

5. Full Name : Upendra V Mogilicherla Preferred Name: Upendra Mobile: 434-329-9307 Visa Status: Permanent Resident(GC) Location: Morrisville, NC Email :upendra_m79@yahoo.com PROJECT DESCRIPTION: Wonderware is the market leader in real-time operations management software. Wonderware software delivers significant cost reductions associated with designing, building, deploying and maintaining secure and standardized applications for manufacturing and infrastructure operations. Our solutions enable companies to synchronize their production and industrial operations with business objectives, obtaining the speed and flexibility to attain sustained profitability. Roles and responsibilities: • Understanding the client requirements by studying functional documents. • Develop and follow Software test plans, Test suites, and Test Cases. • Identification of scenarios for the Requirements. • Updating review comments for Acceptance check list in each sprint. • Strong understanding of the software development lifecycle (including estimation, business analysis, requirements gathering, test verification/validation, business/technical writing) • Writing the test cases based on Functional specs and business requirement documents. • Identified Test requirements and checked if the test cases were complete enough to test the Business functionality • Having good knowledge on Migration, Upgrade, Dongle licensing and Alarm functionality. • Reviewing the Test cases and suggesting modifications through review report. • Configuring, Installing and Troubleshooting Supervisory platform products • Performed Functional Testing, Concurrency testing, Performance testing, Recoverability testing, regressing the product, Smoke testing. • Executing the Test cases and reporting the bugs through defect tracking tool. • Involved in developing and debugging WWFAST scripts. • Participated in Test Automation and implementing Framework. • Interacting with the onsite people and resolving the offshore issues. • Publishing daily status reports during execution. • Involved the Regression testing in the Application server track by using WWFAST tool. CLIENT Wonderware Application server(www.invensys.com) LOCATION Hyderabad DURATION Dec ‘10 – Nov’12 ROLE Sr.Product Assurance Engineer TOOL Clear case, Clear Quest & WWFAST

6. Full Name : Upendra V Mogilicherla Preferred Name: Upendra Mobile: 434-329-9307 Visa Status: Permanent Resident(GC) Location: Morrisville, NC Email :upendra_m79@yahoo.com Project #3 PROJECT DESCRIPTION: This is the Online Banking Project that provides Services in different areas like Bill Payment, Funds Transfer, and Investment Services. The project also deals with the Security feature, making the Customers of the Bank more confident. The Security is maintained with SMS OTP. SMS OTP is One Time Password sent to Customer through SMS, for specific transactions like Adding of Payee, Funds Transfer and Bill Payment. The application also deals with Merchant payment, Cheque and DD mailing to Customer's address making the client enjoy the luxury of getting the cheques and DD’s at doorstep. Roles and responsibilities: • Preparation of Test Plan and Test Estimation • Understanding the Client Requirements and project functionality • Coordinating with IBM Quality Team and Preparing process documents • Identified Test requirements and checked if the test cases were complete enough to test the Business functionality • Reviewing the Test cases and suggesting modifications through review report. • Preparing the WPI’s • Preparation of the Test Data sheet and seeing to that the data is properly set-up • Defect Tracking • Resource & Work planning for the team, • Working on Risk assessment, • Lessons Learnt Meetings with the Development team • Performed Firmware (Build) testing, Hardware(ATM),Sanity testing, Functional testing, Usability testing, User interface testing, Compatibility testing, Interruption testing, Regression testing and Performance testing. • Executing the Test cases and reporting the bugs through defect tracking tool. • Daily updating the Test case execution status. • Discuss with Customer to understand and identify the business scenarios and understand the scope. • Have attended training in Diebold company and to familiarize, expert on ATM testing. • Analyze the Test results and prepare a final Test summary report. • Executed successfully Performance Testing for Quarterly release. CLIENT DBS Banking, Singapore LOCATION Hyderabad DURATION Oct2009 – Aug2010 ROLE Mobile Test Lead TOOL Clear case, Clear Quest

7. Full Name : Upendra V Mogilicherla Preferred Name: Upendra Mobile: 434-329-9307 Visa Status: Permanent Resident(GC) Location: Morrisville, NC Email :upendra_m79@yahoo.com • Publishing daily status reports during execution. Project #4 PROJECT DESCRIPTION: Wal-mart is the largest retailer in the world. Bigger than Europe's Carrefour, Tesco, and Metro AG combined, it is the world's #1 retailer, with more than 7,870 stores, including about 890 discount stores, 2,970 combination discount and grocery stores (Wal-Mart Supercenters in the US and ASDA in the UK), and 600 warehouse stores (SAM'S CLUB). About 55% of its stores are in the US, but Wal-Mart continues expanding internationally; it is the #1 retailer in Canada and Mexico and it has operations in Asia (where it owns a 95% stake in Japanese retailer SEIYU), Europe, and South America. Roles and responsibilities: • Verifying the Business requirement document and Technical design document against requirements • Verifying the requirements against SMART & SIPOC criteria and logging the defects. • Conducting Peer reviews. • Initiating calls with onsite co-coordinator and client. Project #5 CLIENT Wal-Mart Test Support and Services LOCATION Hyderabad DURATION Jun2009- Sep2009 ROLE Business Analyst TOOL NA

8. Full Name : Upendra V Mogilicherla Preferred Name: Upendra Mobile: 434-329-9307 Visa Status: Permanent Resident(GC) Location: Morrisville, NC Email :upendra_m79@yahoo.com PROJECT DESCRIPTION: The purposes of the Document Information Management System performance Test is to is to validate that the Documentation Information Management System capacity & stability, response time SLAs, and user & transaction load requirements are met. The response times SLAs, user & transaction load requirements were gathered from the IT, business partners. In addition, this Performance Test should define the server resource utilization of the application and provide feedback for system optimization, server sizing, and stability. Roles and responsibilities: • Discuss with Customer to understand and identify the business scenario and understand the scope. • Coordinate with team members on day-to-day status of the environment. • Prepare the Performance Test Requirement with details about Test environment Hardware/Software specification, Communication Matrix and details about the key business process. • Prepare Test Specification document, which defines the transactions to be executed for the Test period based on the customer requirement. • Record scripts, using Web protocols. • Troubleshoot errors during scripting and fix those errors. Enhance with Correlation and Parameterization. • Prepare data for the scripts using Data preparation scripts. • Execute the test for various loads and recorded the response time. • Prepare the Hardware Comparison sheet UAT vs. Production box to calculate the load ratio between the environments. • Executed the HTTP-web, XML scripts for Baseline, Rendezvous, Load, Volume and Capacity tests • The environment was monitored by Site scope, Web Sphere and Oracle monitors. • Diagnosis the performance test results and Isolate the bottlenecks and recommend the tuning parameter within the system • Analyze the Test results and prepare a final Performance Test summary report differentiating resources usage for various types of Tests (Baseline, Rendezvous, Load, Volume and Capacity). • Executed successfully Web sphere Optimization test within the system. • Executed successfully Performance Testing for various Quarterly releases. CLIENT DIMS LOCATION Chicago, USA DURATION Aug2008- May2009 ROLE Performance Quality Analyst TOOL Load Runner 9.1

9. Full Name : Upendra V Mogilicherla Preferred Name: Upendra Mobile: 434-329-9307 Visa Status: Permanent Resident(GC) Location: Morrisville, NC Email :upendra_m79@yahoo.com Project #6 PROJECT DESCRIPTION: The objective of this performance testing is to provide the measurements and data from which to tune the system to meet production expectations and to enhance system reliability. FIFA is the world governing body for the sport of football (soccer). FIFA is located in Zurich, Switzerland and is structured as a non-profit entity. FIFA conducts several worldwide football competitions, the largest of which is FIFA World Cup™. The 2010 FIFA World Cup South Africa™ will bring together 32 national teams from around the globe to compete in the 64-game world championship across South Africa in 10 venues. Roles and responsibilities: • Discuss with Customer to understand and identify the business scenario and understand the scope. • Prepare the Performance Test Requirement with details about Test environment Hardware/Software specification, Communication Matrix and details about the key business process. • Prepare Performance Test Plan document, which defines scope, approach and types of performance testing, performance testing deliverables and release guidelines. • Installing Load runner 9.1 ,creating scripts, execution and analysis of test results at Client location .(South Africa) • Record scripts using Web protocols. • Troubleshoot errors during scripting and fix those errors. Enhance with Correlation and Parameterization. • Prepare data for the scripts using Data preparation scripts. • Execute the test for various loads and recorded the response time. • Executed the HTTP-web scripts for Baseline, Load and Volume tests. • The environment was monitored by IIS and Oracle monitors. • Diagnosis the performance test results and Isolate the bottlenecks and recommend the tuning parameter within the system • Analyze the Test results and prepare a final Performance Test summary report differentiating resources usage for various types of Tests (Baseline, Load and Volume). • Executed successfully Performance Testing for monthly release. Project # 7 CLIENT FIFA, Federation International de Football Association LOCATION Johannesburg DURATION Jun 2008 – Jul 2008 ROLE Performance Test Lead TOOL Load Runner 9.1,Quality Center 8.2

10. Full Name : Upendra V Mogilicherla Preferred Name: Upendra Mobile: 434-329-9307 Visa Status: Permanent Resident(GC) Location: Morrisville, NC Email :upendra_m79@yahoo.com PROJECT DESCRIPTION: CFI project is an integration of two systems Contact Manager (CM), a loan registration system and Laser Pro Mortgage (LPM), a processing and servicing system, in order to unify the data with single database. The front-end is developed using Delphi and the business logic is implemented at WebSphere with Oracle as Database. The requests from the client were through XML using SOAP protocol. Performance of the middle tier (SOAP requests) and front-end response were considered as key factors. Web/Http protocol was customized to capture the middle tier. Citrix- ICA and Web protocol were used to capture front-end scripts. Roles and responsibilities: • Discuss with Customer to understand and identify the business scenario and understand the scope. • Coordinate with team members on day-to-day status of the environment. • Prepare the Performance Test Requirement with details about Test environment Hardware/Software specification, Communication Matrix and details about the key business process. • Prepare Test Specification document, which defines the transactions to be executed for the Test period based on the customer requirement. • Record scripts, using Citrix ICA/Web protocols. • Troubleshoot errors during scripting and fix those errors. Enhance with Correlation and Parameterization. • Prepare data for the scripts using Data preparation scripts. • Execute the test for various loads and recorded the response time. • Prepare the Hardware Comparison sheet UAT vs. Production box to calculate the load ratio between the environments. • Executed the HTTP-web, Citrix and XML scripts for Baseline, Rendezvous, Load, Volume and Capacity tests • The environment was monitored by Site scope, Web Sphere and Oracle monitors. • Diagnosis the performance test results and Isolate the bottlenecks and recommend the tuning parameter within the system • Analyze the Test results and prepare a final Performance Test summary report differentiating resources usage for various types of Tests (Baseline, Rendezvous, Load, Volume and Capacity). • Executed successfully Web sphere Optimization test within the system. CLIENT CitiGroup LOCATION Hyderabad DURATION Jul ‘07 – May ‘08 ROLE Offshore Coordinator TOOL Load runner 9.0 & 8.1, Site Scope, Precise, Clear case

11. Full Name : Upendra V Mogilicherla Preferred Name: Upendra Mobile: 434-329-9307 Visa Status: Permanent Resident(GC) Location: Morrisville, NC Email :upendra_m79@yahoo.com • Executed successfully Performance Testing for various Quarterly releases. Project # 8 Roles and responsibilities: • Understanding the client requirements by studying functional documents. • Identification of scenarios for the Requirements. • Writing the test cases based on Functional specs and business requirement documents. • Identified Test requirements and checked if the test cases were complete enough to test the Business functionality • Reviewing the Test cases and suggesting modifications through review report. • Performed System testing, Functional testing, Performance testing and Regression testing • Executing the Test cases and reporting the bugs through defect tracking tool. • Involved in developing and debugging VB scripts and Keyword script template. • Participated in Test Automation and implementing Framework. • Performed Test script execution using Excel template. • Daily updating the Test case execution status. • Interacting with the onsite people and resolving the offshore issues. • Publishing daily status reports during execution. • Involved the Regression testing in the IB track by using QTP tool. Project #9 CLIENT CISCO LOCATION Hyderabad DURATION Oct ‘06 – Jul ‘07 ROLE Test Engineer TOOL Oracle database C3 and CIBER, Quality Center-8.2 & QTP -8.2.

12. Full Name : Upendra V Mogilicherla Preferred Name: Upendra Mobile: 434-329-9307 Visa Status: Permanent Resident(GC) Location: Morrisville, NC Email :upendra_m79@yahoo.com PROJECT DESCRIPTION: Business Process Manager layers above eGate to enable process driven integration. eInsight allows business analysts to model, test, implement, monitor, manage and optimize business processes that orchestrate the flow of activities across any number of Web services, systems, people and partners. eInsight provides an open graphical modeling environment using BPMN (Business Process Modeling Notation) for the graphical modeling notation and BPEL4WS (Business Process Execution Language for Web Services,i.e., . WS-BPEL) for executing the process. With eInsight in place, there is no need for employees to manually bridge the gaps between systems: eInsight automates these interactions, accelerates processes, lowers the operational costs, and dramatically improves process visibility and quality. eInsight lets businesses monitor, manage, analyze and optimize key processes as they happen to satisfy customer demands more quickly than the competition. The upshot...managers are better informed and better able to make the rapid decisions required by today's dynamic business environment and front-line employees have the knowledge to make decisions that optimize performance. ROLES AND RESPONSIBILITIES: • Coding • Configuring, Installing and Troubleshooting the Application Servers listed above. • Functional Testing, Concurrency testing, Performance testing, Recoverability testing, regressing the product, Smoke testing. • Develop and follow Test Plans, Test Suites, and Test Cases. • Working on Different UNIX Databases. • Understand Software Requirement Specifications and develop Test cases for the same. • Interacting closely with members of the Research and Development team, HFE (Human Factor Engineering) team and other subject matter experts to solicit contents and review comments for documents. • Bug Reporting. • Tracking changes in the software products and accordingly updating the test suites and test cases. • Understand the scope and interacting with the Onsite team and defining the scope and building the business scenario. • Responsible for performance testing of application using Load Runner to identify server response under peal/off peak load. • Preparation of LR script and debug the script with predefined and user defined function and enhances the script using correlation and parameterization to run for multiple iteration and different data. • Used Rendezvous point to better control and generate peak load on the server to stress and measure the performance. • Used Ramp-up and Ramp-down features to initiate virtual user actions at specified time intervals to emulate the real world scenario CLIENT Sun Microsystems LOCATION Hyderabad DURATION Jun 2004 – Jul 2006 ROLE SDET TOOL Load Runner 9.1, Onyx 4.5

13. Full Name : Upendra V Mogilicherla Preferred Name: Upendra Mobile: 434-329-9307 Visa Status: Permanent Resident(GC) Location: Morrisville, NC Email :upendra_m79@yahoo.com • Created scenarios for peak load and offload to measure performance time for each transaction. • Extensively worked with Load Runner Controller to create multiple virtual users and executed them to identify the server responses under various scenarios. • Executing baseline test in QA environment on a daily basis to monitor the response time of each transaction for different code and documenting • Analyze the performance test results and prepare a final summary Test summary report and Publishing daily status reports for the customer to view • Monitored web and application server windows resources and identifying bottlenecks of application and database servers. Project #10 Description: HMS is application software for an outpatient Hospital at USA. This project has been categorized under five modules; Check-In Module, Data Entry Module, Doctor Module, Transcriber Module and checkout Module. In this software the Time Management is also maintained. This Time Management helps us to know the time that the patient has spent at various points. ROLES AND RESPONSIBILITIES: • The Test Plan, which outlines all the test cases to be executed. • Performing the Overall QA on each new build • Involved in Functional in order to verify proper processing in a stand-alone environment. • Involved in Regression and Performance Testing of the application. • Manual test Cases were created to validate the Functionality. • Created and executed Test scripts, and Test Cases. • Creating Virtual users, Scenarios. • Regression testing is implemented at various phases of the development and test cycles. CLIENT Francisco Cardiac Center, Lasvegas.Nevada. U.S. LOCATION Hyderabad DURATION Oct 2003 – Apr 2004 ROLE Testing TOOL Load Runner 7.6, Onyx 4.5

Add a comment