THE EDDLINGTON CENTRE EDDLINGTON LANE EDDLINGTON DONCASTER DN12 1PL G59 APPROVAL FOR A 25,000W GRID-TIED PHOTOVOLTAIC ARRAY

THE BRIEFDAS Solar undertook the feasibility study on the site of a converted Junior school on the outskirts of Doncaster. Thesite is now home to a resource and learning centre run by an independent charity. The site was made up of onebuilding centred on a large open courtyard. Built in the 1930s its structure and composition were the first prioritywhen assessing the site. The roof is of traditional construction with flat roofed areas covering entrance halls and oflater construction the main joining corridor within the quadrant. The tiled roof was covered with handmaderosemary type tiles original to the building. Sarking felt under these tiles was absent and there was evidence ofdamage on all roofs. The basic structure however was in good condition with no evidence of water ingress, damp orstructural fragility.The site is in use every day and gets very busy at times. Special attention was going to have to be given to protectionof the general public and staff within. The project would have to go ahead while the centre was still in use.Return on investment was paramount to the funding of the project. We calculated the system would pay for itself inless than seven years, a terrific investment for our client.The electrical system with in building is brand-new with several sub-metered distribution boards scatteredthroughout. The three phase supply continued to all these boards and lent itself perfectly to the retro fit PV arrayproposed.PROPOSAL ACCEPTEDThe office based team swing immediately into action. Planning applications, G59 applications and an EnergyPerformance certificate are standard requirement of the project. These are made along with the instruction ofCharted Structural Surveyor, Access Contractor and Health and Safety Assessor. These reports are received andfindings reviewed. These are then discussed with the client and fixes and alternatives agreed.

THE EPC ARRIVESIt’s not good news. The boiler and main source of heating is coal fired. This fact alone means the property will neverreach the required D band needed to qualify for the top rate of financial return without spending in the region of tenthousand pounds. We adjust the figures to compensate analysed the costing and maintain the overall return oninvestment would be almost identical if we scaled down the installation to just 12 kW. We chose the north roof asaccess, safe working and electrical connection are considerably more cost effective.With PV Installed Without PV InstalledSOME QUICK MATHS, IT STILL MAKES SENSE .

STRUCTUREOn this occasion the roof needed significant structural work. The calculations are made and the correct methodsemployed to ensure this will never become an issue. Over 120 lm of timber along with heavy gauge nuts, bolts, andwashers are used to pin the roof fabric together following the structural reports instruction to the letter.

REMEDIAL WORKSKing trusses, perlins and rafters not strong enough?We strengthen and brace the entire roof structure. Available roof space will allow a 12kW array to be installed oneach of the two main south facing roofs. The total weight of each array is well over a ton. f

ELECTRICAL DESIGNMain three phase cabling within requires no upgrade. Arrays can be fed directly into sub-distribution boards within 3meters of the loft mounted inverters.Each array is separately metered ensuring the most accurate production figures are available. Use of twoindependent GSM modem units means this information is available at the touch of a button and in real time. All thisadds up to minimal voltage drop losses and an excellent efficiency for the client and the environment. Ourspecification included the market leading SMA Tri-power TL Inverters. Two units were required as the arrays were onopposite edges of the site.The electrical drawings and calculations are completed and distributed to the relevant network connection authorityfor consideration.FINE TUNINGWe produce 3D animations of the suns path over the site. This allows our engineers to select the best possiblemodule configuration. All shading issues are overcome to allow optimum operation. These calculations are checkedand double checked by our electrical engineers.

PLANNING APPLICATION ACCEPTEDWe get the go ahead from the local authority.DISTRICT NETWORK OPERATOR APPROVES CONNECTIONAt long last we can proceed to site.

ESTABLISH SITE AND ERECT SUITABLE ACCESSThe fun part starts and our highly skilled installation crews arrive on site. Our scaffolder is on site the same day. Anexclusion zone is created beneath the work area and maintained throughout the installation. Notices are placed andsafety briefings given. The premises general manager is briefed on the schedule of works and works with us toensure a safe working site at all times.Measurements are checked and the installation begins.

THE INVERTERWe position the inverter in the centre of the loft directly above the distribution board. A dwarf support wall ischosen to mount the inverter. The existing loft hatch is too small to accommodate the large unit. It’s stripped outand reinstated with a larger diameter hatch to allow future removal of the unit if required.DC isolation switches are fitted to the reverse of the wall and channelled through to feed the inverter. Once invertedthe AC power then runs back through a separate channel to the main isolation switch. Everything is labelled and iseasily identified. The new loft hatch is made and fitted by our joiner’s onsite.

THE ROOFKnown as “pigs” in the solar industry, the reputation of these roof tiles is well known. Normal Rosemary tiles aredifficult to work with but the tiles on this roof were handmade, much larger than the modern Rosemary and almostimpossible to match.Repairs were made to ensure roof integrity beneath the array; we give a water tight guarantee on all our projects.

THE ARRAYWe install 48 modules in landscape orientation. This maximises the potential of the roof space and array. Each row isa single string of 12 making any future string diagnostic issues straight forward.Anchors are set at the very edge of the array giving complete stability during heavy winds and periods of prolongedwinter weather. We test every module as it comes up on the roof and check this against the factory flash tests.

COMMISSIONThe most important part of the installation is the testing of the entire electrical system. We label up all distributionboards, isolators, wiring runs, MCBs and meter positions. We test all the existing hard wiring within the buildingbefore connecting our installation. Each string is tested and checked before connection into the inverter. All AC testing and earthing arrangements aredouble checked, tested and recorded as needed for the installation certificate and also to satisfy the DNO’srequirements. On this occasion a representative from BRE attends site on behalf of the client and inspects theworks.

HANDOVERHaving fulfilled our obligations and satisfied the inspection the site is cleared and handed back. All paperwork iscompleted and handed over in the operation and maintenance manual. Wiring schematics are finalised andpublished. All relevant authorities are made aware of the installation as prescribed in engineering recommendationG59-1.

MONITORING AND MAINTENANCEDAS solar will monitor and maintain this installation for the next 25 years. The Estler A1100 GSM meter gives usinstant access to array performance in real time. The system is monitored remotely and can be accessed online byboth ourselves and the client. The data is recorded and assessed on a daily basis to maintain the highest possibleyield and operational performance. All components are tested periodically and by our skilled electrical engineersensuring optimum production. We recommend cleaning the modules, as a minimum, once a year and is part of ourinspection.This 12kW system will exceed our expectations by a minimum of 20% paying back the initial £22,000 investmentfivefold and continue to produce clean renewable electricity for the next 40 years.It will produce over 300,000 kilowatt hours of sustainable electricity saving over £££££££tons of co2.

THE OPS TEAM THE EDDLINGTON CENTREBRAD “UGLY” KIRKBRIDE LEE WOODS NIGEL”DUMBLEDOR”WHITE STEVE SPENCER WAYNE “WIGGY” CLARK DARREN GRAHAM

Add a comment

Related presentations

Presentación que realice en el Evento Nacional de Gobierno Abierto, realizado los ...

In this presentation we will describe our experience developing with a highly dyna...

Presentation to the LITA Forum 7th November 2014 Albuquerque, NM

Un recorrido por los cambios que nos generará el wearabletech en el futuro

Um paralelo entre as novidades & mercado em Wearable Computing e Tecnologias Assis...

Microsoft finally joins the smartwatch and fitness tracker game by introducing the...

Related pages

Edlington Leisure Centre

Dearne Valley Leisure Centre; Edlington Leisure Centre; Fitness Village ... 847 3000 45 Registered Charity No 1103465 Doncaster Conferences ...
Read more

Edlington Community Centre - Community Centres in ...

Edlington Community Centre is listed under the Doncaster Community Centres category and is ... Doncaster Women's Centre: Womes Centre 21 Cleveland ...
Read more

Edlington Hilltop Centre

The Edlington Hilltop Centre is making a major contribution to the ... Edlington Hilltop Centre Edlington Lane, Edlington, Doncaster, South Yorkshire ...
Read more

Edlington in Doncaster - Cylex UK Directory

Results for Edlington in Doncaster; customer reviews, prices, ... Edlington Hair Centre. 2 Edlington Ln DN12 1BS Doncaster. 01709 868444... hair salon, ...
Read more

Edlington Sports Centre Edlington, Doncaster DN12 1HD ...

Edlington Sports Centre in Edlington, Doncaster. Edlington Sports Centre. Address: Tait Avenue. Postcode: DN12 1HD. ... Tait Avenue, Eddlington Edlington ...
Read more

MOT Test and service centre Edlington Motors

Edlington Motors, Doncaster. ... For MOT testing and MOT repairs come to Edlington Motors, the number one MOT testing centre in Doncaster,
Read more

UPVC Trade Centre Ltd, Doncaster | Double Glazing ...

Find UPVC Trade Centre Ltd in Doncaster on Yell. Get contact details and map directions. ... UPVC Trade Centre Ltd. Tel: 01709 864754 Old Billiard Hall, ...
Read more

Contact Us | Edlington Hilltop Centre

Contact Us; Contact Us. Edlington Lane, Edlington, Doncaster. South Yorkshire. ... Edlington Hilltop Centre Edlington Lane, Edlington, Doncaster, South ...
Read more

Contact us | Edlington Dental Practice

Contact us. Edlington Dental ... The Martinwells Centre Thompson avenue Edlington Doncaster ... The Martinwells Centre also offers a library and two doctor ...
Read more

Edlington School, Doncaster, South Yorkshire

The school is controlled by Doncaster Council ... the country boys and girls of secondary school age have to apply to come to Edlington School; ...
Read more