Solar Park Executive summary

33 %
67 %
Information about Solar Park Executive summary

Published on September 19, 2016

Author: OlegGramotenko

Source: slideshare.net

1. Zhitomir Solar Park EXECUTIVE SUMMARY www.zhitomirsp.weebly.com September 2016 STRICTLY PRIVATE & CONFIDENTIAL

2. STRICTLY PRIVATE & CONFIDENTIAL General Information The sites is located in Zhitomir region and have size of 135 ha. Based on the latest experience of visits and technical analysis around 60 MW can be installed with an energy yield in a range of 1109 kWh/kWp per year. Installation can be finished in 9-13 months with experienced team. Site is large enough to easily incorporate PV power plant and no major obstacles and issues are foreseen. The general improvements are more on pre-work on the accessibility in the civil engineering package. The critical components are the transformers, but with the latest development of local suppliers and successful completion of the previous projects, the delivery can be managed on time. A detail topographical map and a soil analysis are essential for the final layout. The team has to analyze the best mounting structure for this are with the best interface to the ground and we assume that localized product range can be integrated into this project. In addition to this detailed analysis with the local utility needs to be initiated. Power plant has a significant capacity and this power needs to be transferred to the high voltage grid. As a result, it could be concluded that this plant can be easily technically installed. We are looking forward to review with you our EPC concept to start the design and installation as soon as possible. Sincerely Yours, Oleg Gramotenko 2

3. STRICTLY PRIVATE & CONFIDENTIAL 1. Ukraine Solar Energy information 3

4. Quantity of RES-electricity production licensees and RES-electricity generating capacities, 2009-2015 4

5. The average weighted feed-in tariffs, 2012-2015 5

6. Actual volume of electricity produced from solar power, 2012-2015 6

7. Dynamics of actual prices for traditional and renewable energy, 2014-2015 7

8. Actual price per MW·h (solar), €ct 8

9. 1.1 About ZHITOMIR SOLAR PARK • ZHITROMIR SOLAR PARK – including 4 sites http://zhitomirsp.weebly.com for solar energy plant with all permissions. 1. Bolohyvsky Solar Park 1 LLC is located on 31,89 hectares. The estimated total capacity around 13,1 MW. 2. Bolohyvsky Solar Park 2 LLC is located on 38,11 hectares. The estimated total capacity around 15,7 MW. 3. Irshanska SES LCC is located on 35,74 hectares. The estimated total capacity around 17 MW. 4. Ganska SES LLC is located on 30 hectares. The estimated total capacity around 15 MW. STRICTLY PRIVATE & CONFIDENTIAL

10. STRICTLY PRIVATE & CONFIDENTIAL 2. Project information 10

11. STRICTLY PRIVATE & CONFIDENTIAL 2.1 Project background Project is planned to be installed in Zhitomir region, with capacity about 60 MW. Project Zhitomir Solar Park Total capacity Solar irradiation Expected net annual energy production Annual energy yield Feed-in tariff Land lease agreement Annual land lease cost Annual O&M cost Technology Panels Inverters MS CNBM Sungrow Akcome n/a 4% 49 years 0.15 EUR/kWh 1 109 MWh/year 65 000 MWh 1 050 kWh/m2 60 MW 11

12. 2.2 Land Lease Agreement Land plot information  Land plot is rented (official document – “Certificate”, confirming subsequent land allotment is in place)  Land lease agreement is signing a Pre-drafting stage of solar power station construction (scheme below)  Agreement term – 49 years  Land lease tax tariff – 4% of land value  The SPV have the right to extend, renew or purchase the land plot at the end of the agreements STRICTLY PRIVATE & CONFIDENTIAL 12 SPV • 4 SPV LLC (4 sites) 135 Area, ha Obtained certificate Agreement status

13. STRICTLY PRIVATE & CONFIDENTIAL 2.3 Infrastructure For O&M and construction needs the access road from nearest public road to the solar parks will be constructed. Roads of 4 meters and several parking places will be constructed for services during maintenance of the solar parks. All roads will be made from gravel without asphalt coverage. Service roads Service and construction office will consist of 2-floor masonry building and several garages for machineries, which will work on site. The building will have independent boreholes and water treatment facilities Service and construction office Site will be protected by fence which consist of panel 2,3 x 2 meters and piles each 2 meters. The land plot will be surrounded with 0,5 high barbered wire. The access for trucks will be enabled by the 5 meters gate. Fence Security system will consist of passive and active parts: •Passive part of security system will allow detecting possible criminals on the land plot, by monitoring current actions. It presumes installment of radars and self focused cameras, which will be synchronized in one system that could work independently with backup batteries. •Active protection system is portrayed by military security company, working 24 hours a day on site. With support of passive system, it will detect and neutralize all possible criminals. Security system 13

14. STRICTLY PRIVATE & CONFIDENTIAL 2.4 Land evaluation Risk Obstacles Power lines Comments There are shrubs and trees on the territory of the site Not ready at the moment and need to be constructed Geology survey have to be ordered. There is highway along west border of the site medium medium medium low Soil condition Accessibility Topography There is power station 110/35/10 kV at the distance of 2,8 km from the site. mediumGrid Connection low The terrain is flat with slopes up to 1° -lowEnvironmental concern -lowHealth and safety Risk of unauthorized intruders from the nearby village, which will be covered by the highly efficient security system of nearly small sized land plot. low / mediumSecurity 14

15. Transformer annex area 2.5 Site description Location: Zhytomyr region, Ukraine Latitude and longitude: 49°56'25“N 27°48'31“E SPV: Bolohyvsky Solar Park 1 Ltd Land area: 31,89 ha Capacity: 13,1 MW* Irradiation level: 1325,1 kWh/m2 Climate: summer is mostly hot, winter is mild and snowy. There is quite high solar activity in the region. Connection point: substation 110/10 kV. The topography of the surface of the plot Basic parameters 15 Description of the Site: •SPV construction site is located west of the village of Yurovka, outside centres of population. •Southward slopes up to 1.5° predominate within the site. • An automobile road is located not far from the northern boundary of the site. N S * - indicated capacity corresponds to location of photovoltaic modules only on unshaded area. Symbol legend: - Area shadowed throughout the year; - Tile drainage pipes Bolohyvsky Solar Park 1 Bolohyvsky Solar Park 2

16. Transformer annex area 2.5 Site description Location: Zhytomyr region, Ukraine Latitude and longitude: 49°56‘2“N 27°48'44"E SPV: Bolohyvsky Solar Park 2 Ltd Land area: 38,11 ha Capacity: 15,7 MW* Irradiation level: 1325,1 kWh/m2 Climate: summer is mostly hot, winter is mild and snowy. There is quite high solar activity in the region. Connection point: substation 110/10 kV. The topography of the surface of the plot Basic parameters 16 Description of the Site: • SPV construction site is located west of the village of Yurovka, outside centres of population. • Northward slopes up to 2° predominate within the site. • An automobile road is located approximately 0.7 km from the site. N S * - indicated capacity corresponds to location of photovoltaic modules only on unshaded area. Symbol legend: - Area shadowed throughout the year; - Tile drainage pipes Bolohyvsky Solar Park 1 Bolohyvsky Solar Park 2

17. 2.5 Site description Location: Zhytomyr region, Ukraine Latitude and longitude: 50°49'34"N 28°48'33"E SPV: Irshanska SES Ltd Land area: 35,74 ha Capacity: 17 MW* Irradiation level: 1319,8 kWh/m2 Climate: summer is mostly hot, winter is mild and snowy. There is quite high solar activity in the region. Connection point: substation 110/10 kV “Meleni”. The topography of the surface of the plot Basic parameters 17 Description of the Site: • SPV construction sites are located west of the village of Meleni, outside centres of population. • Southward and south-eastward slopes up to 1° predominate within the site. • An automobile road is located 0.35 km north of the site. N S Substation 110/10 kV “Meleni” Symbol legend: - Area shadowed throughout the year; - Fenced off area of high-voltage power line 110 kV Site №3 Site№2 Site №1 Water drain Irrigation channel * - indicated capacity corresponds to location of photovoltaic modules only on unshaded area.

18. STRICTLY PRIVATE & CONFIDENTIAL 2.5 Site description Location or picture of land here Location: Zhitomir region, Ukraine Latitude and longitude: 49°55'4"N 28°39‘20"E SPV: Ganska SES Ltd Land area: 30 ha Capacity: 15 MW* Irradiation level: 1349,5 kWh/m2 Climate: summer is mostly hot, winter is mild and snowy. There is quite high solar activity in the region. Connection point: substation 110/35/10 kV “Berdichiv”. The topography of the surface of the plot Basic parameters 18 Description of the Site: •The land lot for construction of PhES is located to the east of the city of Berdichev outside the settlements. •The area of the land lot has different slopes up to 1°. •There is a motorway along the western boundary of the site. N S Legend: - The area shaded throughout a year PS 110/35/10 kV “N. Berdichev” * - the power value is specified of the photovoltaic modules are placed only on the unshaded area.

19. STRICTLY PRIVATE & CONFIDENTIAL 2.6 Irradiation analysis, energy output The irradiation levels that the project is going to be exposed to varies on the monthly basis as illustrated above. Annual irradiation level is 1349,5 kWh/m2, which enables the electricity generation of about 1109 kWh/kWp annually. Expected net annual energy production will be about 14024 MWh. The solar irradiation levels experienced in Zhytomyr region of Ukraine are amongst the highest in the country, about 1150-1400 kWh per