Contents : Six Sigma : An Overview What is Six Sigma? Why Six Sigma? Six Sigma Phases : Define, Measure, Analyze, Improve and Control Tools and Key Roles for Six Sigma If you find this presentation useful, please consider telling others about our site (www.exploreHR.org)

Six Sigma : An Overview

What is Six Sigma?

Why Six Sigma?

Six Sigma Phases : Define, Measure, Analyze, Improve and Control

Tools and Key Roles for Six Sigma

www.exploreHR.org You can download this presentation at: Please visit www.exploreHR.org for more presentations on leadership, personal development, and HR management.

Why Six Sigma?

What is Sigma ? Sigma A term used in statistics to represent standard deviation, an indicator of the degree of variation in a set of a process

What is Six Sigma? Six Sigma A statistical concept that measures a process in terms of defects – at the six sigma level, there 3.4 defects per million opportunities A philosophy and a goal : as perfect as practically possible A methodology and a symbol of quality

Sigma Level 3.4 6 233 5 6,210 4 66,807 3 308,537 2 Defects per Million Opportunities Sigma Level (Process Capability)

Sigma Level Six Sigma = 99,9997%

Sigma Level Every hour the postal service would lose 20,000 pieces of mail Every day our drinking water would be unsafe for almost 15 minutes Every week there would be 5,000 surgical operations that go wrong in some way Every month we would be without electricity for almost seven hours Why not Four Sigma or 99.379% ?

Every hour the postal service would lose 20,000 pieces of mail

Every day our drinking water would be unsafe for almost 15 minutes

Every week there would be 5,000 surgical operations that go wrong in some way

Every month we would be without electricity for almost seven hours

Why Six Sigma? Money Customer Satisfaction Growth Quality Competitive Advantage Employee Pride

At GE, Six Sigma added more than $ 2 billion to the bottom line in 1999 alone Motorola saved more than $ 15 billion in the first 10 years of its Six Sigma effort AlliedSignal reports saving $ 1,5 billion through Six Sigma. Why Six Sigma?

At GE, Six Sigma added more than $ 2 billion to the bottom line in 1999 alone

Motorola saved more than $ 15 billion in the first 10 years of its Six Sigma effort

AlliedSignal reports saving $ 1,5 billion through Six Sigma.

Why Six Sigma? Six Sigma is about practices that help you eliminate defects and always deliver products and services that meet customer specifications

Cost of Poor Quality What is cost of scrap? What is cost of rework? What is cost of excessive cycle times and delays?

Cost of Poor Quality What is cost of business lost because customers are dissatisfied with your products or services? What is cost of opportunities lost because you didn’t have time or the resources to take advantage of them?

Critical-to-Quality (CTQ) Elements of a process that significantly affect the output of that process. Identifying these elements is figuring out how to make improvements that can dramatically reduce costs and enhance quality.

Six Sigma Phases

D efine M easure A nalyze I mprove C ontrol Six Sigma Phases D M A I C

Define Measure Analyze Six Sigma Phases Define the project goals and customer (internal and external) deliverables Measure the process to determine current performance Analyze and determine the root cause(s) of the defects

Improve Control Six Sigma Phases Control future process performance Improve the process by eliminating defects

Six Sigma Phases Define Define Customers and Requirements (CTQs) Develop Problem Statement, Goals and Benefits Identify Champion, Process Owner and Team Define Resources Evaluate Key Organizational Support Develop Project Plan and Milestones Develop High Level Process Map

Define Customers and Requirements (CTQs)

Develop Problem Statement, Goals and Benefits

Identify Champion, Process Owner and Team

Define Resources

Evaluate Key Organizational Support

Develop Project Plan and Milestones

Develop High Level Process Map

Six Sigma Phases Measure Define Defect, Opportunity, Unit and Metrics Detailed Process Map of Appropriate Areas Develop Data Collection Plan Validate the Measurement System Collect the Data Begin Developing Y=f(x) Relationship Determine Process Capability and Sigma Baseline

Define Defect, Opportunity, Unit and Metrics

Detailed Process Map of Appropriate Areas

Develop Data Collection Plan

Validate the Measurement System

Collect the Data

Begin Developing Y=f(x) Relationship

Determine Process Capability and Sigma Baseline

Six Sigma Phases Analyze Define Performance Objectives Identify Value/Non-Value Added Process Steps Identify Sources of Variation Determine Root Cause(s) Determine Vital Few x's, Y=f(x) Relationship

Define Performance Objectives

Identify Value/Non-Value Added Process Steps

Identify Sources of Variation

Determine Root Cause(s)

Determine Vital Few x's, Y=f(x) Relationship

Six Sigma Phases Improve Perform Design of Experiments Develop Potential Solutions Define Operating Tolerances of Potential System Assess Failure Modes of Potential Solutions Validate Potential Improvement by Pilot Studies Correct/Re-Evaluate Potential Solution

Perform Design of Experiments

Develop Potential Solutions

Define Operating Tolerances of Potential System

Assess Failure Modes of Potential Solutions

Validate Potential Improvement by Pilot Studies

Correct/Re-Evaluate Potential Solution

Six Sigma Phases Control Define and Validate Monitoring and Control System Develop Standards and Procedures Implement Statistical Process Control Determine Process Capability Develop Transfer Plan, Handoff to Process Owner Verify Benefits, Cost Savings/Avoidance, Profit Growth Close Project, Finalize Documentation Communicate to Business, Celebrate

Define and Validate Monitoring and Control System

Develop Standards and Procedures

Implement Statistical Process Control

Determine Process Capability

Develop Transfer Plan, Handoff to Process Owner

Verify Benefits, Cost Savings/Avoidance, Profit Growth

Close Project, Finalize Documentation

Communicate to Business, Celebrate

Define Measure Analyze Improve Control Deliverables : Fully trained team is formed, supported, and committed to work on improvement project. Team charter developed, customers identified and high impact characteristics (CTQs) defined, business process mapped.

Deliverables :

Fully trained team is formed, supported, and committed to work on improvement project.

Team charter developed, customers identified and high impact characteristics (CTQs) defined, business process mapped.

Checkpoints for Readiness Team Readiness : Team is sponsored by a champion or business leader.  Team formed and team leaders assigned.  Improvement team members fully trained on Six Sigma and DMAIC.  Define Measure Analyze Improve Control Team Charter : Completed project management charter, including business case, problem and goal statements, project scope, milestones, roles and responsibilities, communication plan.

Checkpoints for Readiness

Team Readiness :

Team is sponsored by a champion or business leader. 

Team formed and team leaders assigned. 

Improvement team members fully trained on Six Sigma and DMAIC. 

Team Charter :

Completed project management charter, including business case, problem and goal statements, project scope, milestones, roles and responsibilities, communication plan.

Define Measure Analyze Improve Control Checkpoints for Readiness Customers Customer(s) identified and segmented according to their different needs and requirements. Data collected and displayed to better understand customer(s) critical needs and requirements. Business Process Mapping Completed, verified, and validated high-level 'as is' (not 'should be' or 'could be') business process map. Completed SIPOC representation, describing the Suppliers, Inputs, Process, Outputs, and Customers.

Checkpoints for Readiness

Customers

Customer(s) identified and segmented according to their different needs and requirements.

Data collected and displayed to better understand customer(s) critical needs and requirements.

Business Process Mapping

Completed, verified, and validated high-level 'as is' (not 'should be' or 'could be') business process map.

Completed SIPOC representation, describing the Suppliers, Inputs, Process, Outputs, and Customers.

Define Measure Analyze Improve Control Deliverables : Key measures identified, data collection planned and executed, process variation displayed and communicated, performance baselined, sigma level calculated.

Deliverables :

Key measures identified, data collection planned and executed, process variation displayed and communicated, performance baselined, sigma level calculated.

Define Measure Analyze Improve Control Checkpoints for Readiness Key Measures Identified Key measures identified and agreed upon. High impact defects defined and identified in the business process. Data Collection Planned and Executed Solid data collection plan established that includes measurement systems analysis. Data collected on key measures that were identified.

Checkpoints for Readiness

Key Measures Identified

Key measures identified and agreed upon.

High impact defects defined and identified in the business process.

Data Collection Planned and Executed

Solid data collection plan established that includes measurement systems analysis.

Data collected on key measures that were identified.

Define Measure Analyze Improve Control Checkpoints for Readiness Process Variation Displayed/Communicated Process variation components displayed/communicated using suitable charts, graphs, plots. Long term and short term variability accounted for. Performance Baseline/Sigma Calculation Measure baseline process performance (capability, yield, sigma level).

Checkpoints for Readiness

Process Variation Displayed/Communicated

Process variation components displayed/communicated using suitable charts, graphs, plots.

Long term and short term variability accounted for.

Performance Baseline/Sigma Calculation

Measure baseline process performance (capability, yield, sigma level).

Define Measure Analyze Improve Control Deliverables : Data and process analysis, root cause analysis, quantifying the gap/opportunity.

Deliverables :

Data and process analysis, root cause analysis, quantifying the gap/opportunity.

Define Measure Analyze Improve Control Checkpoints for Readiness Data and Process Analysis Identify gaps between current performance and the goal performance. Root Cause Analysis Generate list of possible causes (sources of variation). Segment and stratify possible causes (sources of variation). Prioritize list of 'vital few' causes (key sources of variation). Verify and quantify the root causes of variation.

Checkpoints for Readiness

Data and Process Analysis

Identify gaps between current performance and the goal performance.

Root Cause Analysis

Generate list of possible causes (sources of variation).

Segment and stratify possible causes (sources of variation).

Prioritize list of 'vital few' causes (key sources of variation).

Verify and quantify the root causes of variation.

Define Measure Analyze Improve Control Checkpoints for Readiness Quantifying the Gap/Opportunity Determine the performance gap. Display and communicate the gap/opportunity in financial terms.

Checkpoints for Readiness

Quantifying the Gap/Opportunity

Determine the performance gap.

Display and communicate the gap/opportunity in financial terms.

Define Measure Analyze Improve Control Deliverables : Generate (and test) possible solutions, select the best solutions, design implementation plan.

Deliverables :

Generate (and test) possible solutions, select the best solutions, design implementation plan.

Define Measure Analyze Improve Control Checkpoints for Readiness Generating (and Testing) Possible Solutions Possible solutions generated and tested.

Checkpoints for Readiness

Generating (and Testing) Possible Solutions

Possible solutions generated and tested.

Define Measure Analyze Improve Control Checkpoints for Readiness Selecting The Best Solution(s) Optimal solution selected based on testing and analysis. New and improved process ('should be') maps developed. Cost/benefit analysis of optimal solution(s). Small-scale pilot for proposed improvement(s). Pilot data collected and analyzed. Improved process ('should be') maps modified based on pilot data and analysis. Project impact on utilizing the best solution(s).

Checkpoints for Readiness

Selecting The Best Solution(s)

Optimal solution selected based on testing and analysis.

New and improved process ('should be') maps developed.

Cost/benefit analysis of optimal solution(s).

Small-scale pilot for proposed improvement(s).

Pilot data collected and analyzed.

Improved process ('should be') maps modified based on pilot data and analysis.

Project impact on utilizing the best solution(s).

Define Measure Analyze Improve Control Checkpoints for Readiness Designing Implementation Plan Solution implementation plan established, including schedule/work breakdown structure, resources, risk management plan, cost/budget, and control plan. Contingency plan established.

Checkpoints for Readiness

Designing Implementation Plan

Solution implementation plan established, including schedule/work breakdown structure, resources, risk management plan, cost/budget, and control plan.

Contingency plan established.

Define Measure Analyze Improve Control Deliverables : Documented and implemented monitoring plan, standardized process, documented procedures, response plan established and deployed, transfer of ownership (project closure).

Deliverables :

Documented and implemented monitoring plan, standardized process, documented procedures, response plan established and deployed, transfer of ownership (project closure).

Define Measure Analyze Improve Control Checkpoints for Readiness Monitoring Plan Control plan in place for sustaining improvements (short and long-term). Process Standardization New process steps, standards, and documentation are ingrained into normal operations. Documented Procedures Operating procedures are consistent. Knowledge gained on process is shared and institutionalized.

Checkpoints for Readiness

Monitoring Plan

Control plan in place for sustaining improvements (short and long-term).

Process Standardization

New process steps, standards, and documentation are ingrained into normal operations.

Documented Procedures

Operating procedures are consistent.

Knowledge gained on process is shared and institutionalized.

Define Measure Analyze Improve Control Checkpoints for Readiness Response Plan Response plans established, understood, and deployed. Transfer of Ownership (Project Closure) Transfer ownership and knowledge to process owner and process team tasked with the responsibilities.

Checkpoints for Readiness

Response Plan

Response plans established, understood, and deployed.

Transfer of Ownership (Project Closure)

Transfer ownership and knowledge to process owner and process team tasked with the responsibilities.

Tools and Roles for Six Sigma

Creating flowcharts of the step in a process – operations, decision points, delays, movements, handoffs, rework, loops, and controls or inspections. A process map is illustrated description of how a process work. Tools for Six Sigma Process Mapping

Creating flowcharts of the step in a process – operations, decision points, delays, movements, handoffs, rework, loops, and controls or inspections.

A process map is illustrated description of how a process work.

DOE is a structured, organized method for determining the relationship between factors (Xs) affecting a process and the output of that process (Y). Tools for Six Sigma Design of Experiments or DOE

DOE is a structured, organized method for determining the relationship between factors (Xs) affecting a process and the output of that process (Y).

A group of rows and columns, with one set of increments marked along the X (horizontal) axis and another set of increments marked along the Y (vertical) axis. The purpose of using XY matrix is to study and understand the relationship between what you are putting into a process and what your customer is getting out of it. The XY matrix allows the team to identify gaps, areas for improvement. Tools for Six Sigma XY Matrix

A group of rows and columns, with one set of increments marked along the X (horizontal) axis and another set of increments marked along the Y (vertical) axis.

The purpose of using XY matrix is to study and understand the relationship between what you are putting into a process and what your customer is getting out of it.

The XY matrix allows the team to identify gaps, areas for improvement.

The goal of this tool is to ensure that your measurement system is statically confident – that it’s both accurate and precise each and every time it is used. Undertaken during Measure phase, your MSA determines whether or not you can take a certain measurement and repeat or reproduce it among different people who take the same measurement. Tools for Six Sigma Measurement System Analysis

The goal of this tool is to ensure that your measurement system is statically confident – that it’s both accurate and precise each and every time it is used.

Undertaken during Measure phase, your MSA determines whether or not you can take a certain measurement and repeat or reproduce it among different people who take the same measurement.

Process capability tool is the measure of a process being able to meet specification requirements and fulfill customer CTQ needs on a long term basis. Tools for Six Sigma Process Capability Tool

Process capability tool is the measure of a process being able to meet specification requirements and fulfill customer CTQ needs on a long term basis.

Investigating a theory about the suspected cause (s) of a particular effect in a process to determine if it is correct. It’s a compass that points you directly to the vital few factors that are most affecting your process. Tools for Six Sigma Hypothesis Testing

Investigating a theory about the suspected cause (s) of a particular effect in a process to determine if it is correct.

It’s a compass that points you directly to the vital few factors that are most affecting your process.

The manner in which a part or process can fail to meet a specification, creating a defect or non-conformance, and the impact on the customer if that failure mode is not prevented or corrected. Tools for Six Sigma Failure Mode Effect Analysis

The manner in which a part or process can fail to meet a specification, creating a defect or non-conformance, and the impact on the customer if that failure mode is not prevented or corrected.

A detailed assessment and guide for maintaining all the positive changes you, your black belt, and the project team have made. It ensures that all your analysis and efforts stay in effect and that you have information at your disposal to prevent backsliding or a return to less than optimal performance standard. Tools for Six Sigma Control Plan

A detailed assessment and guide for maintaining all the positive changes you, your black belt, and the project team have made.

It ensures that all your analysis and efforts stay in effect and that you have information at your disposal to prevent backsliding or a return to less than optimal performance standard.

Champions Are responsible for the Six Sigma implementation across the organization in an integrated manner. Champions also act as mentor to Black Belts. Includes CEO and other key top management team members. They are responsible for setting up a vision for Six Sigma implementation. Key Roles for Six Sigma Executive Leadership

Black Belts Operate under Master Black Belts to apply Six Sigma methodology to specific projects. They primarily focus on Six Sigma project execution. Identified by champions, act as in-house expert coach for the organization on Six Sigma. They devote 100% of their time to Six Sigma. Key Roles for Six Sigma Master Black Belts

Are the employees who take up Six Sigma implementation along with their other job responsibilities. They operate under the guidance of Black Belts and support them in achieving the overall results. Key Roles for Six Sigma Green Belts

Six Sigma Do’s Do communicate the commitment company-wide Do demonstrate the commitment of company leaders Do empower your key human resources Do provide on-site mentoring for black belts

Do communicate the commitment company-wide

Do demonstrate the commitment of company leaders

Do empower your key human resources

Do provide on-site mentoring for black belts

Six Sigma Do’s Do be patient at the inception of you six Sigma initiative Do claim and advertise early “wins” Do benchmark Do establish project baseline and goals

Do be patient at the inception of you six Sigma initiative

Do claim and advertise early “wins”

Do benchmark

Do establish project baseline and goals

Recommended Further Readings: Greg Brue, Six Sigma for Managers , McGraw Hill George Eckes, Six Sigma for Everyone , John Wiley and Sons

Greg Brue, Six Sigma for Managers , McGraw Hill

George Eckes, Six Sigma for Everyone , John Wiley and Sons

End of Material

Add a comment

Related presentations

Related pages

Six Sigma – Wikipedia

Six Sigma (6σ) ist ein Managementsystem zur Prozessverbesserung, statistisches Qualitätsziel und zugleich eine Methode des Qualitätsmanagements.
Read more

Six Sigma for Managers: 24 Lessons to ... - amazon.de

Greg Brue - Six Sigma for Managers: 24 Lessons to Understand and Apply Six Sigma Principles in Any jetzt kaufen. ISBN: 9780071455480, Fremdsprachige ...
Read more

Six Sigma for Managers: 24 Lessons to ... - amazon.de

Six Sigma for Managers: 24 Lessons to Understand and Apply Six Sigma Principles in Any Organization (The McGraw-Hill Professional Education Series) eBook ...
Read more

4managers - Management: Six Sigma

Wir glauben, dass Six Sigma das überzeugendste und bahnbrechendste Managementinstrumentarium ist, das jemals erdacht wurde, schreiben Mikel Harry und ...
Read more

Six Sigma Training for Managers

I am looking for information on the benefits a company has seen from training their managers in Six Sigma. We are embarking on training our top key ...
Read more

Six Sigma For Managers - Greg Brue - Google Books

THE BRIEFCASE BOOKS SERIES. Now translated into nine languages! This reader-friendly, icon-rich series is must reading for all managers at every level.
Read more

Six Sigma For Managers - amazon.com

Rated 3.5/5: Buy Six Sigma For Managers by Greg Brue: ISBN: 9780071387552 : Amazon.com 1 day delivery for Prime members
Read more

Six Sigma Managers - iSixSigma: Six Sigma Resources for ...

I am looking for a format to report the status of all of our six sigma projects to management. I need some idea’s on how to track project status and put ...
Read more

International Association for Six Sigma Certification

IASSC IS a Professional Association dedicated to growing and enhancing the standards within the Lean Six Sigma community. IASSC is the only independent ...
Read more

Lean Six Sigma Certification | 6 Sigma Training

6Sigma.us offers Lean Six Sigma certification and training through classroom, online, onsite, and webinar programs for well over 4,000 organizations.
Read more