1. SBE ASSIGNMENT 2 Electrical services related assignment

2. FROM WHERE? • Only LT lines comes to f block along with solar connections.(we are not considering) • The line comes from generator 1 (dc set 1) near swimming pool.

3. 2 LT PANELS ARE THERE

4. • ON RIGHT LT PANEL(taking more load) • MCCB 250 AMP/240sqmm cable is coming • It is divided into 7 • MCCB 100 AMP/70 sqmm • 7 section includes • Basement • Gf • Ff • Sf • Tf • Ff • Ff(rics)

5. • ON left LT PANEL(taking more load) • MCCB 250 AMP / 185 sqmm cable is coming • It is divided into 6 • MCCB 100 AMP/ 70 sqmm • 6section includes • Basement • Gf • Ff • Sf • Tf • Ff

6. TO BUS BAR IN EACH FLOOR

7. THEN TO MCB’S IN DIFFERENT PARTS • Each class room is connected seperate