RP 060xxx RAN 4 report

67 %
33 %
Information about RP 060xxx RAN 4 report
Entertainment

Published on December 29, 2007

Author: Tatlises

Source: authorstream.com

RAN 4 Report RP-070277:  RAN 4 Report RP-070277 Howard Benn Summary:  Summary 2 meetings since last RAN meeting Adhoc in Sophia Antipolis, main meeting in Kobe Consistent number of delegates (around 100) 400 input contributions in Kobe Corrections to the specification (cat B,C & F numbers) Release 99 – CRs Release 4 – CRs Release 5 - CRs Release 6 – CRs Release 7 - CRs There will be 2 WG meeting before the next plenary. Slide3:    R99 Category B spurious emission limits for TDD BS and repeater reflecting new limits agreed with CEPT/ECC Rel – 4 Rel – 5 Correction to Node B test model Corrections to low chip rate TDD HSDPA Looking at a new method to measure the CQI reporting, this is probably take a few meetings to resolve R99 – Rel-5 Highlights Rel-6 Highlights:  Rel-6 Highlights TEI-6 TEI - 7:  TEI - 7 High speed train requirements Uplink and downlink simulations completed CRs with performance requirements approved Correction of Test Case for Inter-system Handover from UTRAN FDD to GSM Introduction of band X into the repeater specification Repeater ACRR description RRM test cases for UE with multiple receive antennas Result of RAN 1 CR on linear average Work needed to complete CR TEI-8:  TEI-8 Proposal to add 15 code 16 QAM requirements Request to spec clock accuracy on IuB Passed to plenary for discussion of which working group this falls under Work and Study Items:  Work and Study Items Highlights:  Highlights MIMO Work continues Low Chip rate E-DCH Simulation results presented CRs approved UE Antenna Performance Evaluation Method and Requirements Discussion continues Proposal to work with COST 2100 Follows on from COST273 LMU performance spec Simulation assumption presented Initial simulation results Work continues Improved performance requirements:  Improved performance requirements Further Improved Performance Requirements for UMTS/HSDPA UE (FDD) Dynamic reconfigurable receivers Questions raised on impact to network Others:  Others CPC Simulation results presented for ideal and implementation margin Demod performance CR approved 16 QAM uplink Work proceeding One more meeting cycle needed 64 QAM downlink Work proceeding Performance CRs approved Few issues – see status report One more meeting cycle needed Slide11:  MBSFN New channel model under discussion First set of simulations performed Type 3i performance requirements Discussed testing scenarios to reduce complexity UMTS 1500 TR approved Enhanced cell FACH testing Question over which release performance requirements should be in ? Slide12:  Interference mitigation study item Simulations showed limited performance improvements Agreed no need to standardise performance Home Node B Work started Conference call before the Orlando meeting to progress the work LTE:  LTE Close to being on schedule Channel options below 5 MHz 1.4 MHz and 3 MHz proposed by a number of companies but not agreed PHS co-existence Still working on a solution UE TR Baseline transmitter requirements agreed Baseline RF receiver performance agreed Channel models agreed Work plan for demodulation requirements agreed Meeting schedule:  Meeting schedule

Add a comment

Related presentations

Related pages

RAN 4 Report RP-040171

RAN 4 Report RP-040171 Howard Benn RAN 4 Chairman-2-Thank you • Many thanks to Nakamura-san for ... – RAN 4 to investigate between now and next meeting
Read more

TSG RAN Meeting #24 RP-040160 Seoul, Korea, 2 - 4 June ...

... RAN Meeting #24 RP ... 4 June 2004 Status Report for SI to TSG Study Item Name: FS on UTRA WideBand Distribution Systems SOURCE: 3GPP Support TSG: RAN ...
Read more

The Next Level: Speed Run 4 (MIRROR MODE) - YouTube

Need to report the video? Sign in to report inappropriate content. Sign in. Transcript; ... Buy access to play a mirrored version of Speed Run 4.
Read more

Polizei Rheinland-Pfalz - Presse und Aktuelles

rlp.de; Presse und Aktuelles. Presse und Aktuelles. Gebärdensprache unterstützt das polizeiliche Beratungsprogramm Vorbeugungstipps in Gebärdensprache ...
Read more

Polizei Rheinland-Pfalz - Startseite

Kontakt | Impressum | Datenschutz | rlp.de | © Landespolizeischule Rheinland-Pfalz / Abteilung 3 -1- ...
Read more

Error message when you run the "Report as finished" report ...

Error message when you run the "Report as finished" report in Microsoft ... In Production in Microsoft Dynamics AX 4.0, click Production ...
Read more

McAfee Labs Threats Report - Intel Security-McAfee ...

McAfee Labs Threats Report, November 2014 | 4 Executive Summary ... Our predictions run the gamut, including opinions around the Internet of Things,
Read more

MLB 15 Road to The Show - Part 101 - WORLD SERIES HOME RUN ...

... WORLD SERIES HOME RUN! (Playstation 4 Gameplay) TmarTn2. Subscribe Subscribed ... Sign in to report inappropriate content. Sign in.
Read more

STATE OF KANSAS - SHaRP SYSTEM Report ID: PAY021 EMPLOYER ...

Report ID: ... On Cycle CONFIRMED Run Time 08:57:08 Department 9500000000 Sample Department ... K9900765461 Strong ,I. M. 0.81 2.43 4.05 14.32
Read more

Kleve - Aktuelle Nachrichten | RP ONLINE

Genießen Sie alle Vorteile Ihres persönlichen RP ONLINE Profils. oder: Das Passwort muss mindestens 5 Zeichen lang sein. ... Im Gegenzug folgt am 4.
Read more