Large climate chamber OWI-Lab

0 %
100 %
Information about Large climate chamber OWI-Lab
Technology

Published on January 30, 2014

Author: pieterjanjordaens

Source: slideshare.net

Description

OWI-lab invested in a large climatic test chamber to test and validate large and heavy turbine components in extreme temperature setting from -60°C to +60°C.

OWI-Lab’s Large climatic test chamber Arctic or desert conditions on demand The wind power industry is rapidly expanding in windy and remote areas where turbines have to work under extreme conditions. Onshore and offshore wind turbines are usually designed to operate in temperatures ranging from -10°C to +40°C, but in locations like Finland, Canada, Mongolia, and other cold climate regions temperatures drop to as low as -40°C. On the other hand, turbines located in hot regions, like some parts of India for example, can be exposed to temperatures of up to 55°C. These hostile weather conditions form a huge challenge to the equipment itself and to maintenance and repair teams. Repairs may have to be postponed because of restricted access caused by weather conditions, clearly impacting on turbine availability and profitability. That is why the industry needs cost-effective, robust, validated components capable of withstanding extreme conditions. In response to this need, OWI-Lab has built a dedicated test facility at the Port of Antwerp featuring a large climatic chamber for wind turbine component testing in a wide range of temperatures. Mechanical, hydraulic and electrical turbine components weighing up to 150 tonnes or more, such as gearboxes, transformers, generators, pitch & yaw systems, etc. can be tested in temperatures ranging from -60°C to +60°C. Typical prototype testing activities in this facility include design verification testing and component validation. Dedicated R&D tests are supported by providing all required auxiliaries such as a flexible set of power supplies (up to 2MVA). To perform cold soak and cold start-up tests of gearboxes, generators and other rotating equipment, a dedicated no-load test bench with 10.000Nm brake away torque has been built. OWI Offs ho Win re d Infra st App ructure licat ion Lab

OWI-Lab’s large climatic test chamber Extreme temperature testing & wind turbine component validation Main purpose Testing and validating large and heavy wind turbine components under extreme temperatures: gearboxes, transformers, yaw & pitch systems, hydraulic units, hydraulic drive trains,… Other components from different industries can also be tested: heavy industry applications; aerospace components, power aggregates, radar systems, wave and tidal converters, etc. Although OWI-Lab focuses on wind energy related testing, the facility is also available for other industries: heavy machinery, off-highway, automotive, etc. Location The large climatic test chamber is embedded in the OWI-Lab test facility located at the Port of Antwerp , near the Zuid-Natie breakbulk terminal. All logistics are available on site to handle large, heavy machinery. The quay has a load capacity of 45 tonnes/m2. M  aximum dimensions of test specimen Length: 10m Width: 7m Height: 8m Test area space: 560m3 T  emperature test range -60°C to +60°C T  emperature accuracy approx. 1K after stabilisation time Total installed electrical power of machinery 408kW Air speed at the cooling outlets 5-7 m/s Maximum weight of test specimen 150 tonnes Maximum floor load of climate chamber 30 tonnes/m 2 Cooling rate approx. 0,022K/min (+20°C to -60 °C in 60 hours for 100 tonnes of steel) (1 hour to cool down the empty chamber from +60°C to -40°C) H  eating up rate ± 0,028 K/min (-60°C to + 20°C in 48 hours for 100 tonnes of steel) Maximum cooling capacity at -60°C 40 kW (250 kW at -20°C) Maximum cooling capacity at +60°C 150 kW Main entrance test specimen 7m x 8m (width x height) double wing door E  ntrance lock gate 0.9m x 2m (width x height) Available •  urface-heated operator window to monitor tests S •  daptive cable penetration up to 90mm in diameter for cables and sensors A (multi-diameter module system) •  I data-acquisition equipment (RTD, thermocouple,…) N •  ecessary protective clothes to enter the climatic chamber at extreme N temperatures •  uxiliaries needed for setting up a full test campaign can be provided A on demand: electrical power supply (400V to 22kV ; 50Hz / 60Hz and up to 6MVA); load banks up to 6MVA, additional air heaters and coolers for system tests, hot water supply for testing cooling systems, thermal camera,… •  15kW no-load testbench with a maximum break-away torque of 10kNm in 3 order to cope with cold start-up tests of rotating machinery like gearboxes, hydraulic transmissions and generators www.owi-lab.be Contact information Pieter Jan Jordaens Mobile: +32/491 34 53 82 pieterjan.jordaens@sirris.be

Add a comment

Related presentations

Presentación que realice en el Evento Nacional de Gobierno Abierto, realizado los ...

In this presentation we will describe our experience developing with a highly dyna...

Presentation to the LITA Forum 7th November 2014 Albuquerque, NM

Un recorrido por los cambios que nos generará el wearabletech en el futuro

Um paralelo entre as novidades & mercado em Wearable Computing e Tecnologias Assis...

Microsoft finally joins the smartwatch and fitness tracker game by introducing the...

Related pages

Climate chamber testing | Owi-lab

OWI-Lab's large climatic test chamber ... One-stop-shop for climate chamber testing of ... tests on new de-icing technique at OWI-Lab’s climate chamber.
Read more

Large climate chamber | Owi-lab

Large climate chamber © OWI-Lab © OWI-Lab. Liquid filled wind turbine transformer test © OWI-Lab. ... Bird Rader climate chamber test © OWI-Lab. About OWI.
Read more

Mobile bird-radar system tested at OWI-Lab’s large ...

... tested a trailer based bird-radar system in OWI-Lab’s large climatic test chamber last ... Lab’s large climate chamber: http://www.owi-lab.be ...
Read more

The Use of a Large Climate Chamber for Extreme Temperature ...

Offshore Wind Infrastructure Application Lab (OWI-Lab) The use of a large climate chamber for extreme temperature. testing & turbine component validation
Read more

TU Delft researchers test innovative de-icing technique in ...

... blades and used the large climate chamber at Sirris’s OWI Lab to ... at Sirris’s OWI Lab in late 2015. The large climate chamber is ...
Read more

The OWI Lab publishes a white paper on the importance of ...

The OWI Lab publishes a white paper on the importance of climate chamber ... and this is possible in the OWI Lab’s climate chamber. ... 3D printing large ...
Read more

OWI-Lab: Improving Reliability in the Wind Turbine Industry

OWI-Lab: Improving Reliability in the Wind Turbine Industry. of 1. OWI-Lab: Improving Reliability in the Wind Turbine Industry. Pieter Jan Jordaens.
Read more

Pieter Jan Jordaens | LinkedIn

View Pieter Jan Jordaens’ professional profile on LinkedIn. ... A day with OWI-Lab - Inauguration large climate chamber Offshore Wind Magazine. October 2012.
Read more