TRAINING REPORT FOR JAL NIGAM GOMTI ACTION PLAN & USAB TECH.

ACKNOWLEDGEMENT • I WOULD LIKE TO THANK MR. ……………………….. OUR PROJECT MANAGER AT JAL NIGAM UNDER WHOSE ENRICHING GUIDANCE THIS PRESENTATION HAS PROVEN TO BE SUCH A SUCCESS. • I WOULD ALSO LIKE TO THANK ALL MY FACULTY MEMBERS, FRIENDS AND MY FAMILY FOR THEIR CONSTANT SUPPORT .

LUCKNOW’S USHER ~ GOMTI RIVER • TRIBUTARY OF GANGA ORIGINATING FROM VILLAGE CHANDERPUR AND MERGES IN GHAZIPUR • A COURSE OF 715KM THROUGH 15 DISTRICT • THE ULTIMATE 12KM SOURCE OF WATER OF LUCKNOW. • CARRIES 390MLD INDUSTRIAL AND HOUSEHOLD WASTE OUT FROM LUCKNOW. • DAILY DRINKING WATER CONSUMPTION OF LKO 200MLD. • BACTERIA COUNT 2.5X107 /100ML WATER, MAX. PRESCRIBED LIMIT 5000/100ML WATER. • OXYGEN LEVEL 1.2MG/LITRE ,70% BELOW LOWEST SURVIVAL LIMIT FOR AQUATIC LIFE. Dry flow- 1500mld High flow- 55000mld Lean summer flow-500mld

OVERVIEW OF GOMTI ACTION PLAN • IMPLEMENTED AFTER 600 ACRE SEWAGE FARM LAND USE WAS CHANGED AND TRANSFORMED TO GOMTINAGAR. • HIGH LEVEL OF TOXICITY AND DECR. OXYGEN QUANTITY MOTIVATED THE IMPLEMENTATION OF PLAN. • THE PROJECT WAS DIVIDED INTO TWO PHASE WHICH COVERED LUCKNOW,SULTANPUR AND JAUNPUR. • IMPLEMENTATION OF UPFLOW ANAEROBIC SLUDGE BLANKET TECHNOLOGY (UASBT)

PHASE 1 • 42 MLD SEWAGE TREATMENT PLANT AT DAULATGANJ , LKO. • RS 61.01CRORE SANCTIONED BY CENTRE GOVT. • LUCKNOW CITY BUDGET WAS RS 50.29 CRORE . • INTERCEPTION AND DIVERSION OF KUKRAIL NALA , RS 8.06 + RS 5.58 CRORE. • DIVERSION OF SEWAGE OF GAUGHAT,SARKATA,PATA,NAGARIA,WAZIGANJ,GHASIYAMANDIR AND CREATION OF STP. • AMOUNTING TO RS 28.5 CRORE • COMMISSIONED IN 12/2002 • 6.81 CRORE WAS USED FOR EMERGENCY WORK • CLEANING OF MAJOR NALAS ,SEWER CCTV SURVEY ,DIVERSION OF GAUGHAT NALA • RENOVATION OF CIS GOMTI SEWAGE PUMPING STATION (CGSPS) • COMPLETED BY MARCH 1999

PHASE 2 • 120 HECTARE 345 MLD STP AT BHARWARA.,LKO • RS 263.04 CRORE SANCTIONED FOR PHASE 2 ON 70:30BASIS B/W CENTRE AND STATE. • INCREASE IN CAPACITY OF DAULATGANJ STP BY 5MLD.(LATER CANCELLED) • INTERCEPTION OF 19 DRAINS AND DIVERSION TO BHARWARA STP. NER UP/DN STREAM CHINA BAZAR LA-PLACE JOPLING ROAD LAMARTINIERE JIAMAU G.H. CANAL DRAIN MAHESHGANJ ROOPPUR KHADRA MOHANMEAKIN DALIGANJ NO.1 DALIGANJ NO.2 ARTS COLLEGE HANUMAN SETU TGPS KEDARNATH NISHATGANJ BABA KA PURWA

GOMTI ACTION PLAN DESIGN PARAMETERS S.NO. PARAMETER INFLUENT EFFLUENT 1 TOTAL SUSPENDED SOLIDS MG/L 300-600 <50 2 BOD5 MG/L 150-250 <30 3 PH 7-8 7-8 4 MPN PER 100ML 106-109 <104 5 SULPHIDE MG/L <2 • DESIGN AVERAGE FLOW 345 MILLION LITRE PER DAY • PEAK FACTOR 1.50

UASB TECHNOLOGY • ANAEROBIC PROCESS • INITIAL ADOPTION AT KANPUR FOR 5MLD STP UNDER GANGA ACTION PLAN PHASE-1 IN 1988 • EFFICIENCY 65% TO 70% • ADDITIONAL TREATMENT REQUIRED e.g. POLISHING POND(BOD5), AERATED LAGOONS(SULPHUR REMOVAL) etc TO MAINTAIN BOD AND TSS. • EFFLUENCE AND SUSPENDED SOLIDS LESS THAN 30 MG/L & 50 MG/L

RAW SEWAGE FROM MPS INLET CHAMBER SCREEN GRIT CHAMBER PARSHAL FLUME UASB REACTOR PREPARATION TANK POLISHING POND IN 2 STAGES CHLORINE CONTACT TANK BIOGASFOR UTILIZATIONSLUDGE DRYINGBED

UNITS 1. SCREEN-PRE TREATMENT DONE IN SCREEN AND GRIT CHAMBER 2. GRIT CHAMBER-CONTAINS PARTICLES OF SAND,ASH,CLINKER,EGGSHELL ETC .SPECIFIC GRAVITY 2.4-2.65 3. UASB REACTOR 4. PRE AERATION TANK 5. POLISHING TANK 6. CHLORINE CONTACT TANK-5MG/L OF CHLORINE GAS KEPT FOR 30 MIN. 7. SLUDGE DRYING BED-25CM BED FOR 10 DAYS FOR DRYING PURPOSE 8. FILTATE SUMP 9. EFFLUENT DISPOSAL

10. EFFLUENT REUSE 11. RESOURCE RECOVERY VIA BIOGAS AND SLUDGE CAKE 12. EXPECTED BIOGAS RECOVERY 400M3/HR 13. DRY SLUDGE 100TONNES/DAY 14. 1500KVA ELECTRICITY TO BE PRODUCED VIA BIOGAS

SALIENT FEATURES OF 345 MLD UASB STP AT BHAISORA VILLAGE ,LKO S.NO. UNITS NO. SIZE 1 INLET CHAMBER 1 20X9X4M SWD 2 NO. OF STREAM PROPOSED 3 115 MLD EACH 3 DISTRIBUTION CHAMBER 3 8.8X7.5X2M SWD 4 SCREEN(MECHANICAL) 6+3 2 EACH STREAM+1 STANDBY 6X1.8X1M SWD SCREEN(MANUAL) 3 6X2.8X085M SWD 5 GRIT CHAMBER(MECH.) 6 2 FOR EACH STREAM 9.5*9.5*1M SWD (MANUAL STANDBY 50%) 3 1FOR EACH STREAM DIV.IN 2 CHANNEL9.5*4.6*.7 6 PARSHALL FLUME 3 10*1.5*1.5 SWD 7 DIVISION BOX 3 12.8*2.5*2.25 SWD 8 DIVISION BOX 2A 12 4/STREAM 6.85*2*2.25M SWD DIVISION BOX 2B 60 20/STREAM 3.6*1.5*1M SWD 9 UASB REACTOR 11.5 MLD EACH 30 32*28*4.6M SWD(2SET OF 5 REACTOR/STREAM) 10 FEED PIPES(75MM DIA)HDPE 6720 224/REACTOR (4sqm./PIPE) 11 HRT AT AVG. FLOW 8.5 HRS.

S.NO. UNITS NO. SIZE 12 HRY AT PEAK FLOW 5.6HRS. 13 SRT 35 DAYS 14 GAS HOLDER 3 17.5M SWD & 3.5M SWD 15A PRE AERATION TANK 3 29.6*13.5*3M SWD 15B SURFACE AERATOR 6 2/30HP / STREAM 16A POLISHING POND COMP. 1 3 1/STREAM 140*140*3M SWD 16B COMP. 2 3 550*140*1.5M SWD 17 FLOATING AERATOR COMP. 1 18 6/SURFACE AERATOR OF 50HP/STREAM 18 CHLORINE CONTACT TANK 3 60*20*2M SWD 19 CHLORINATION 3 50Kg/hr. Booster pump 20m3/hr@6kg/cm2 20 SLUDGE CONC. 65KG/M3 21 TOTAL SLUDGE GENETATION(WET) 1812 M3/DAY 22 TOTAL SLUDGE GENERATION(DRY) 100 TONNES /DAY 23 SLUDGE SUMP 3 1/STREAM 9.85*6.8*1M SWD 24 SLUDGE PUMP 16(9W+9S) 6/STREAM OF 68m3/hr. at 35m head 25 Sludge drying bed 106 27*27m 26 Sludge cycle 10days

S.NO. UNIT NO. SIZE 27 FILTRATE WATER SUMP 2 10*7.5*1M SWD 28 FILTRATE WATER PUMP 4 41m3/hr. 18m HEAD 29 Total power req. of stp 1500kva 30 Effluent pipe 1500m 2400mm dia RCC pipe 31 Dual fuel engine for bio gas utilization 2 850KVA each 32 Gas flaring system 2 Aspiration type pre mixing burner 6m above G.L.

CONCLUSION OF TRAINING • THIS TRAINING IS COMPREHENSIVE IN FILLING THE GAP BETWEEN THE THEORETICAL & PRACTICAL STUDIES • AT THE SITE THERE WAS A GOOD MANAGEMENT SYSTEM BETWEEN THE CONTRACTOR, THE CONSULTANT, AND THE CLIENT. • I FOUND THAT THERE WAS GOOD UNDERSTANDING BETWEEN THE SUPERVISOR AND THE WORKERS, THOUGH WORKS ARE INTERDEPENDENT BUT THERE WERE NO CONTRADICTION BETWEEN THEM.

Add a comment

Related presentations

Related pages

Uttar Pradesh Jal Nigam - A U. P. Govt. Undertaking

The Gomti Action Plan (GoAP) was formulated in the year 1993 for three towns, namely Sultanpur, Jaunpur and ...
Read more

Gomti action plan - Education

gomti action plan and its implementation and status in uttar pradesh
Read more

Ganga Plan - II - Uttar Pradesh Jal Nigam - A U. P. Govt ...

The phase-II of the Ganga Action Plan was started in the year 1993. ... 3 towns on the bank of river Gomti are under Gomti Action Plan component, ...
Read more

www.moef.nic.in

Gomti Action Plan (GoAP) was approved along with the Yamuna Action Plan at an estimated cost of Rs.58.11 crore in April 1993. The approved cost comprises ...
Read more

“Plan for Gomti restoration ready” | Ganga Action ...

“Plan for Gomti restoration ready” by Times of India. Times of India. Monday, June 20, 2011. Lucknow: The Gomti might bounce back to life as efforts to ...
Read more

REGENERATION AND DEVELOPMENT - Ministry of Environment ...

REGENERATION AND DEVELOPMENT ... Yamuna Action Plan, Gomti Action Plan, Damodar Action Plan, Ganga Action Plan - Main Stem, Works in other Rivers under the
Read more

Pollution of the Ganges - Wikipedia, the free encyclopedia

The Ganga Action Plan or GAP was a program launched in January 1985 by the then Prime Minister Rajeev Gandhi, ... Gomti, Damodar and Mahananda.
Read more

D. Ganga Action Plan - Ganges River - Google Sites

D. Ganga Action Plan ... Gomti Action Plan, Damodar Action Plan, Mahanada Action Plan. The GAP did help to improve the water quality by a small percentage.
Read more

MoEF ANNUAL REPORT 1990-2000 - Ministry of Environment ...

6 REGENERATION AND DEVELOPMENT [Ganga Action Plan Phase I and Phase II, National River Conservation Plan, Yamuna, Gomti and Damodar Action Plans ...
Read more