Extraction of Beam into TT40

40 %
60 %
Information about Extraction of Beam into TT40
Entertainment

Published on June 15, 2007

Author: Pravez

Source: authorstream.com

Slide1:  Extraction of beam into TT40 (Transfer Line from SPS to LHC) Mitaire Ojaruega University of Michigan     Dr. Mike Lamont CERN, Geneva, Switzerland SPS Overview:  SPS Overview SPS – fixed target experiments andamp; injector to LHC (2006) Towards the LHC: beam tests:  Towards the LHC: beam tests TT40 2 x 24 hours, September/October 2003 TI8 4 x 24 hours, September 2004 LHC sector test (one eighth of the ring) 2 weeks, April 2006 TI2 commissioning April 2007 LHC commissioning April onwards 2007 SPS control room:  SPS control room Tunnel:  Tunnel Main elements:  Main elements Bending Magnets dipoles Focusing Magnets quadrupoles Closed orbit Measured with pickups Corrected with small dipole corrector magnets Extraction Bump circulating beam towards extraction point Fast kicker magnet – kick beam out of ring into extraction channel Septum magnet to guide beam into transfer line Beam: bunched, lots of bunches, around 1011 particle per bunch Closed orbit & extraction bumps:  Closed orbit andamp; extraction bumps Slide8:  4 x HB, 4 x VB, 5 x MKE, 1 x TPSG4, 6 x MSE Slide9:  Basic accelerator physics As particles speeds around the ring, it performs transverse oscillations. These obey the Hill’s Equation. The solution to Hill’s equation is similar to that of the SHM… This solution maybe parameterized in terms of Twiss parameters, which allows the calculation of: beam size, trajectory correction etc. Very important for good control of beam at extraction. MAD:  MAD Calculated closed orbit extraction bump in SPS Produced input files for the first part of TI8 Calculated Twiss parameters for this part of the line. Optics calculations are (at CERN) usually done with MAD. (Takes as input a description of the accelerator or transfer line and magnet strengths - can calculate lots of stuff.) MAD sequence files:  MAD sequence files TI8: SEQUENCE, L = 2699.14948; PT4: marker, AT = 0; MDMV400097: MDMV1, AT = 3.706; BPK_400099: BPKV1, AT = 4.305; QTMD400100: MQI1, AT = 5.5; MDMH400104: MDMH1, AT = 6.774; BTV_400105: OTR1, AT = 7.373; MBHC400107: BH1, AT = 10.5, MBHC400118: BH1, AT = 16, MBHC400129: BH1, AT = 21.5,; QTRF400200: QTL2, AT = 28.252; BPK_400207: BPKH2, AT = 30.475; Corrector Pickup Quadrupole Screen Bending Magnets Corrector Beta Function :  Beta Function Slide13:  Closed orbit extraction bump Summary:  Summary Beam to LHC from SPS at 450 GeV via TI8 Extraction: bump, kick, septa, and then bending and focusing in the line. Lots of instrumentation to make sure the beam is going in the right direction Bumps and Twiss parameters calculated using MAD Will be tested in extraction test which takes place in 3 weeks Slide15:  Acknowledgement Many thanks to my supervisor Mike Lamont, Jean Krisch, Homer O’Neal, Tom Dershem, Busted, Lucas, Obnoxious Mute, Mr. Word, Ms. Cool, Slow Blinker, Phi Bang, Sambuca, Terrorist, Mr. Fish, Brian Adams, Anti word, Dr. Love National Science Foundation and the University of Michigan

Add a comment

Related presentations

Related pages

PREPARING THE SECTOR TEST: EXTRACTION, TRANSFER AND ...

Publication » PREPARING THE SECTOR TEST: EXTRACTION, ... the requirements for extraction into TT40, ... During Extraction, Transfer and Injection into ...
Read more

Beam Commissioning of the SPS LSS4 Extraction and the TT40 ...

BEAM COMMISSIONING OF THE SPS LSS4 EXTRACTION AND THE TT40 TRANSFER LINE ... bumper magnets are used to control the circulating beam at extraction.
Read more

Radiation levels in ECA4 during beam extraction into TT40 ...

Radiation levels in ECA4 during beam extraction into TT40 During the operation of CNGS and LHC, protons with momentumof 400 and 450 GeV/c respectively will ...
Read more

Aperture and beam loss during extraction from the SPS and ...

Aperture and beam loss during extraction from the SPS and injection into the CNGS beam line ... At the start of the proton beam line TT40 the extracted ...
Read more

TT40 incident at 23:46 on 25 October 2004

TT40 incident at 23:46 ... •During a high intensity extraction test, a LHC beam ... •The TI8 commissioning and TT40 high intensity were grouped into a ...
Read more

CiteSeerX — PREPARING THE SECTOR TEST: EXTRACTION ...

... In view of the sector test in 2004 the requirements for extraction into TT40, ... THE SECTOR TEST: EXTRACTION ... Beam require-ments ...
Read more

Beam Commissioning of the SPS LSS 4 Extraction and the ...

The new fast extraction system in LSS4 of the SPS and the transfer line TT40 were commissioned with beam in late 2003.
Read more

Commissioning of the CNGS Extraction in SPS LSS4

Commissioning of the CNGS Extraction in SPS ... the beam losses at extraction must be very ... allowed to decay into muons and neutrinos in a 1 km long ...
Read more

THE NEW SPS EXTRACTION CHANNEL FOR LHC AND CNGS

THE NEW SPS EXTRACTION CHANNEL FOR ... blow up of the stored beam. The extraction system should ... vacuum chamber and into the transfer line TT40, ...
Read more

Transfer line damage during high intensity proton beam ...

TRANSFER LINE DAMAGE DURING HIGH INTENSITY PROTON BEAM EXTRACTION FROM THE SPS IN 2004 B.Goddard, ... The extraction from SPS LSS4 [1] into TT40 of nominal
Read more