EnviroInsite training workshop - Developing a conceptual model

50 %
50 %
Information about EnviroInsite training workshop - Developing a conceptual model
Technology

Published on March 5, 2014

Author: BruceJacobs3

Source: slideshare.net

Description

Presentation from EnviroInsite training workshop covering tools for construction of hydrogeologic conceptual model

Developing the Hydrogeologic Conceptual Model EnviroInsite Training Workshop March 2013

660.00 650.00 640.00 630.00 620.00 610.00 660.00 650.00 640.00 630.00 till 640.00 630.00 silt silt bedrock 630.00 clay sand and gravel bedrock 670.00 660.00 650.00 640.00 630.00 620.00 610.00 600.00 Hydrogeologic Conceptual Model sand clay and sand clay silt clay and sand silty clay bedrock till bedrock G GM M X X- -1 1 6 X- 5 14 -1 3 G M X15 G G M M X14 G XG M 1 M X 2 X1 6 GM - 1 X 1 4 H P 5 H -1 H P-1 1-2 P 1 H GH -11 -1 P MX G -1P--1 2 5 1 H G P MX 1- 1M - 1 -1 3 5 X- 1 3 11 -4 6R M GX M -X 16 -1R G M W -3 G M H PH HP 8C HP-8 -8 PC B H -8 H P-8 A P H - 8- 4 P- 3 8H P- 2 81 M W -1 6 W -1 4 M W -1 5 M M W -2 6 M W M M W -3 M W-3- 3 3 M W- 3 5 W 34 -3 -3 M 8 W M -3 MW W 7 -3 M14M M W W W 6 -3 -3 -3 W 6 7 8 M 28 W M 26 W -2 7 GM XG 9 M XG GM 10 M X X- -8 7 Depth (feet) Depth (feet) H G M P- X 7 G M -4 X4 M GM X- X3 3 Depth (feet) M D M -M D W -M 1 D -M W-1 4 W 3 -1 2 H H P- P H 6-3 6-1 P H - 6P- 2 63 M W -1 0 M M M W -1 B WM 1 R- 9 W WR- 3 3 -1 -9D 1 W -1 0 M G Depth (feet) MW-4-9 4 +0 1e 0 +0 1e Depth (feet) 4 +0 1e 0 +0 1e 4 +0 1e 0 +0 1e 4 4 +0 1e 0 +0 1e 0 4 4 +0 1e 0 +0 1e Conceptual Model silty clay silty sand sand sand clayey silt sand silt clayey silt sand 4 4 LM 770.00 760.00 750.00 silt 4000 feet 740.00 sand silt 730.00 gravel sandy silt sand silt 720.00 clayey silt 710.00 silt clayey silt SCIBH-112 silty sand 700.00 silt 690.00 Sample PID Screening (ppm) 0 clayey silt gravel 680.00 sandy silt CH/CL 670.00 660.00 650.00 0 Depth (feet) CH/CL MW-46 4 Depth (feet) C H P7C H P H - 7B P H - 7A PH 7P- 3 M M M 7W W W H -4 -4 -4 P- G2 2 3 4 7-M M M M 1 W XW W -4-2 -4 -4 G GM 2 3 4 M G X- X-1 M 2 XH 1 P H H P 9C H P-99 H P-9 CB H P-9 A P- -4 H H 9H P-9 P31 H P- -2 - 0C P 9H -1 1 H P 0 H P-1-10 -1 H P-1 0 -2 H P-1 0-5 -6 H P- P-1 0-4 H 1 P 0 M 0H -1 A M W-3 P- 0B W 28 10 -2 C 7 Depth (feet) W -8 D W -1 M 3 W M M8 -W W D1 -8 2 M MW R W -5 M - D R -2 M 5 -1 M WW W -5-D BR --1 9D 3 2 Depth (feet) Depth (feet) 4 +0 1e 0 +0 1e 760.6 0 Depth (feet) 4 4 +0 1e 0 +0 1e till sand silt 0 0 LM 10 sand till gravel till CH/CL 4 15 gravel 10 topsoil silty sand clayey silt sand clayey silt 20silty sand gravel sand silty sand 0 10 650.00 640.00 760.7 15 5 sand 762.3 PID Screening (ppm) 760.8 CH/CL silty clay clayey sand sandy clay clayey silt silty sand LM silt sand silt sand 4 +0 1e 15 4 +0 1e 0 +0 1e 10 5 Sample 0 5 770.00 770.00 20 760.00 760.00 750.00 750.00 Wells sand Within 100 feet of section 740.00 0 2000 740.00 Casing 730.00 730.00 till silty clay Screen gravel 720.00 720.00 siltysand clay clayey silt sand silt 710.00 710.00 till sand silt sand till SCIBH-110 SCIBH-111 water 700.00 700.00 level (feet) till Within 100 feet of section till 690.00 690.00 Sample PID Screening (ppm) Sample PID Screening (ppm) 0 680.00 680.00 gravel 670.00 silt sand sand 660.00 0 +0 1e 4 5 0 topsoil 762.7 766.8 • Create Section 794.3 15 LM 810.00 800.00 790.00 780.00 770.00 760.00 750.00 740.00 730.00 720.00 710.00 700.00 690.00 CH/CL 680.00 670.00 660.00 650.00 640.00 CL 630.00 766.8 SCIBH-108 794.7 MW-45 4 0 0 10 790.3 0 15 0 20 topsoil silty clay 810.00 unknown sand 800.00 unknown 790.00 LM sand Borings 780.00 unknown Within 100 feet of section sand 770.00 gravel sand 760.00 topsoil silty clay 750.00 silty clay peat sandy clay 740.00 SCIBH-109 730.00 gravel clayey silt PID Screening (ppm) 720.00 Sample sand and gravel clay 710.00 till sand till 700.00 690.00 silty sand bedrock 680.00 CH/CL unknown sandy silt sand unknown 670.00 gravel 660.00 sand clay and sand silt 650.00 silty gravel gravel sand and silty/sandy clay sand clayey silt/silty clay 640.00 till LM till sand and 630.00 clayey silt with sand gravel silty sand and gravel clay bedrock 620.00 MW-49 4 +0 1e 15 10 770.00 CH/CL silty sand 10 760.00 unknown silty sand 750.00 sand and gravel 15 740.00 silty sand 730.00 silty clay 720.00 LM siltysand clay 710.00 700.00 silty clay 690.00 773.2 680.00 sand and gravel 773.3 670.00 silty clay • Strip Logs 5 817.0 A' MW-52 5 0 +0 1e SB-BR-04 PID Screening (ppm) • Boring Logs MW-51 CH topsoil 770.00 sandy silt silty clay 10 LM silt sandy clay sandy silt 760.00 CL/CH unknown 750.00 silty sand CL silty sand and gravel 15 sandy silt 740.00 silty sand and gravel silty sand clayey silt 730.00 CL/CH clay 720.00 20 sand 710.00 CH silt LM silty sand sand 795.4 700.00 sand and gravel silty silt 798.3 791.7793.3 sand silt 690.00 785.7 clay 680.00 785.8 sand and gravel unknown 798.0 sand and gravel 670.00 clay 793.6 sand 793.7and 792.5 unknown 660.00 799.0 sand and SCIBH-107 gravel 650.00 793.6793.6 clay 792.5 799.1 Samplesilt PID Screening (ppm) 640.00 0 clay sand and gravel sand clay 630.00 sand bedrock 5 CH/CL Sample 0 4 817.0 CH/CL SCIBH-104 PID Screening (ppm) 0 10 800.00 CH 790.00 LM 780.00 15 CH 770.00 CL 760.00 817.2 LM 750.00 815.9 816.7 816.5 814.4 740.00 815.9 814.9 silt 801.8 730.00 811.3 720.00 812.2 710.00 silty sand clayey silt 700.00 805.8silty sand sandy silt silty sand sandy silt 801.9 SCIBH-106 gravel till 690.00 silt till silt Sample PID Screening (ppm) 680.00 gravel 0 till 0 +0 1e 815.8 817.4 5 600 550 802.5 PID Screening (ppm) 817.1 siltysand silty clay clay sand gravel sand silt silty clay 4 820.0 820.3 4 +0 1e 650 M 818.0 819.5 0 +0 1e 700 826.5 Sample 0 -8 W 817.1 819.6 819.7 820.7 10 M H -5 H P-5 C H P-5 B H P- A H P-5 5-2 P- B -R 5- 1 3 1R MA M MM 3 B BR BR R -2 - 1 -2 - 1 R A M BR W -3 M D M M 2 M -1 EW4 M -2 W -7 W M W W -M M WW 4 W 3 M W-4D -3D MG W- 4 W 4 M -41 -D W RH -1 P P5C W W -3 EW -1 B H CH 5 CH/CL 4 +0 1e silty clay 800.00 sand silty sand 790.00 sand silty sand 780.00 15 silt 829.3 770.00 817.1 826.8 CH 830.7 760.00 silty clay silty 20 silty clay 750.00 824.5 silt silty clay 740.00 LM 826.6 silt 730.00 720.00 silty clay silt 710.00 silty sand silt sandy silt 700.00 796.5 silt silty sand gravel SCIBH-105 690.00 silty sand clayey silt M W H -1 PHMW3C P 1 H -3-B P H - 3- 2 P HP-3 3-1 C H P H - 4P H - 4- 1 W H P 2 W H -3 P--4-3 P- 4-4 44 Depth (feet) CH 10 MW-48 5 4 750 0 0 800 Sample CH MW-47 0 Elevation (feet) 850 SCIBH-103 PID Screening (ppm) M CH 5 900 0 W W -8 A Sample M 0 SCIBH-102 PID Screening (ppm) G M G X-1 M 0 G X-7 M X8 G M X- M 9 W SCIBH-101 Sample silty sand

Hydrogeologic Conceptual Model • Boring Logs • Strip Logs • Create Section • 3d Geologic Model Developing Conceptual Model

EnviroInsite Terminology Term Definition Boring Data Detailed soil / rock description as would come from geologist in logging a boring. Stratigraphy Hydrogeologist’s conceptualization of large-scale stratigraphic units. Developing Conceptual Model

What can you do with Boring data? Post Elev. Contour Elev. Logs on Profile 3d Logs Boring Logs Developing Conceptual Model

What can you do with Stratigraphy? Post Elev. Contour Elev. 3d Geologic Model 3d Fence Diagram 3d Logs 2d Geologic Modeling / Logs Developing Conceptual Model

Strip Logs • Integrate multiple sources of data • Downhole charts use data from Point Values table EnviroInsite Training

Point Values table Field Type Well Text Constituent Text Depth Numeric Value Numeric Text Value Text EnviroInsite Training

Developing Hydrogeologic Conceptual Model Hands-on Exercise

EQuIS Source EI Data EQuIS Table.Field Boring Data dt_lithology.material_name dt_lithology.start_depth / end_depth dt_coordinate.elev / elev_unit Stratigraphy dt_lithology.geo_unit_code_1 dt_lithology.start_depth / end_depth dt_coordinate.elev / elev_unit Developing Conceptual Model

Add a comment

Related presentations

Related pages

Developing a Conceptual © The Author(s) 2012 Framework ...

Developing a Conceptual ... conceptual model, ... G., & Griffin, K. (2004). Life skills training: Empirical findings and future
Read more

Developing Conceptual Framework Part 1 - YouTube

How to develop a conceptual framework for developing competence in an area of inquiry
Read more

4. Developing a Framework or Model of Change | Community ...

Describe the intended uses of your framework or model of ... Developing a Logic Model or Theory ... Training teachers to increase effectiveness and ...
Read more

Conceptual - Training Seminars, Resources and Workshops

* During the Workshop: Group based conceptual training imparted ... in developing a ... Conceptual model of training conceptual ...
Read more

High-Level Plan for Creating Training Course

... a work breakdown and task estimates for developing a training ... models for analysis in ... High-Level Plan for Creating Training ...
Read more

Conceptual Model | LinkedIn

View 407 Conceptual Model posts, presentations, experts, and more. Get the professional knowledge you need on LinkedIn.
Read more

IB WORKSHOPS AND RESOURCES - International education ...

IB WORKSHOPS AND RESOURCES ... opportunity to receive category 1 workshop training before ... The workshop will model
Read more

Training Tools for Curriculum Development. A Resource Pack

This Training Tool for Curriculum Development: A Resource Pack is intended ... Developing curriculum training modules ... develop conceptual ...
Read more