Description

Discover the feedback of one of our mobile solutions clients in the Power sector

To quickly reach good steam quality enabling rapidturbine start-up and electricity production“THE SOLUTION OFFERED BY DEGREMONT INDUSTRY, VIA ONDEO IS,ENABLED THE CLIENT TO COMMISSION THE TURBINE TO EXACTINGTECHNICAL DESIGN SPECIFICATIONS AND START ELECTRICITYPRODUCTION WITHIN THE SCHEDULED TIMEFRAME.”Mr Hans CORVERS, OMOBILE Development DirectorDue to the presence of Total Organic Carbon in the produced deminwater, the steamquality wasn’t within their design limits and so the turbine of the new power plant couldn’tbe commissioned. Our customer had to urgently treat this contaminated deminwater.Reliable and flexible, the solution proposed by OMOBILE enabled the client to meet theexacting design limits of the turbine. Thanks to our solution, our customer was able tostart its electricity production within the scheduled timeframe and to limit financialconsequences.

The problem was the presence of Total OrganicCarbon (TOC) in the surface water released byoxidation and not retained by the existing resin deminplant; it decomposes at the high pressure boilerworking conditions and increases the conductivity ofthe produced steam.This increase in conductivity put the quality of theproduced steam above the design limits of the turbinespecifications, so it couldn’t be commissioned.An urgent, reliable and flexible solution was required toproduce as soon as possible the correct steam quality, soenabling the commissioning of the turbine and to startelectricity production.The solution proposed by OMOBILE consisted of a fully automatedmobile water installation, delivered in very quickly, and able totreat the contaminated deminwater at very high flow and withlimited waste water production.OMOBILE set up a mobile installation consisting of cartridge filtrationand reverse osmosis to treat up to 130 m³/h of flow per unit, with arecovery rate up to 95%.With this mobile solution, OMOBILE was able to remove the TOCnecessary to keep the steam conductivity below its design limitationlevels.Ability to continue the commissioning of theturbine & power plantThe proposed solution by OMOBILE allowed theclient to finish the overall commissioning of theturbine & power plant within the scheduledtimeframe.Ability to evaluate technical solutionThe OMOBILE solution allowed the customer totest and validate the treatment line as a pilot trial andto approve the best technical solution before building apermanent treatment plant.> Treatment of contaminated rainwaters before discharge.> Treatment of stored industrial contaminated waters before discharge.> Treatment of contaminated groundwaters before re-use.

Add a comment

Related presentations

Related pages

Mobile Units - Degremont Technologies - Worldwide Water ...

Degremont Technologies Mobile Units: ... Case Studies. By Brand By Solution ... In addition, Degremont Industry provides staff training and maintenance ...
Read more

Resources - Case Studies - By Brand - Degremont ...

Resources > Case Studies > By Brand. ... View case study. Kewaunee Nuclear Power Station ... Compact UCD ® Units. View case study. Case Study (en français)
Read more

Case studies - Cengage Learning - Education - Engaged with you

Case studies Introduction A ... US steel industry C-121 Case 11 Philip Condit and the Boeing 777: ... business units and/or individuals in a case. As appro-
Read more

Torque Measurement Solutions | HBM

Torque Measurement in Power Test ... Case Study about an innovative application by the French company ... Industry Solutions. Customer Case Studies . Support.
Read more

Panduit | Data Center, Industrial, Enterprise, OEM, MRO ...

Solutions in data center power ... Product Catalogs Articles Brochures Case Studies White Papers ... Introducing the newest mobile application from Panduit!
Read more

Biodigester Global Case Studies - MIT - Massachusetts ...

Biodigester Global Case Studies ... Case Study #2: Power Generation ... livestock, processing industry, and distribution
Read more

Degremont - Water Treatment solutions

Case studies; Youtube: ...
Read more

Register for Water Online, Industry Newsletters, and Site ...

Register for Water Online and gain access to industry newsletters, rich editorial content, white papers, case studies, ... Sign up for the Power Online ...
Read more