advertisement

eicher tractor

50 %
50 %
advertisement
Information about eicher tractor
Education

Published on January 23, 2009

Author: ravindramishra01

Source: authorstream.com

advertisement

Case studyJUST IN TIME ATEICHER TRACTORS : Case studyJUST IN TIME ATEICHER TRACTORS BACKGROUND OF THE CASE : BACKGROUND OF THE CASE The year 1986 was significant for Eicher Tractors as the company was faced with increasing competition and initiated a series of strategic changes to consolidate and improve their position in the market Slide 3: They restructured the entire operations and made substantial investments in technology to meet the market requirements. They implemented PLAN ‘M’ aimed at upgrading product quality and operating systems Objectives of PLAN ‘M’ : Objectives of PLAN ‘M’ To produce every component and assembly as per drawings and specifications with less fatigue and effort from workmen. To change handling of stores and materials in all stages of production to ensure that material was available in the right quantity at the right time in the right Company History : Company History 1948 – Good earth Company was established to sell and service imported tractors. 1959 – Eicher Tractor Corporation of India Pvt. Ltd. was setup by Mr. M.M. Lal. in collaboration with Gebr Eicher of West Germany 1960 – The first tractor manufactured in India rolled out of the Faridabad plant. Slide 6: 1960’s – Govt. regulations on imports resulted in the company achieving 85% indigenization. 1970’s – Achieved 100% indigenization and setup two new factories in Alwar and Parwanoo. 1980’s – Changed its name to Eicher Goodearth Limited and diversified into LCV. Also, setup a new LCV manufacturing unit in Prithampur . Major Reorganization in Eicher tractors : Major Reorganization in Eicher tractors The reason of reorganization was increasing competition and sustainability. Each of the three independent plants were reorganized into interdependent plants. Parwanoo – Gears and transmission production Alwar – Engine manufacturing Faridabad – Final assembly Modernization : Modernization Introduced the concept of producing every component and every assembly as per drawing and specifications. Company moved existing machinery and installed new ones. Changed production and procurement processes, renovated buildings and changed layouts on the shop floor. Company taken decision to produce 24hp tractors to cater to small farmers. Total quality management model : Total quality management model Just in time system : Just in time system It was introduced in stages. Transmission sub assembly was chosen for starting work on JIT implementation. Line was designed by analyzing the work content and choosing a target cycle time. Cycle time was measured as one vehicle every so many minutes Slide 11: This cycle time would match the required capacity of the plant in terms of vehicles per day. The work was broken down so that each work station had a work content that took less time than the cycle time. In line with the philosophy of JIT the work content at which station was not sought to be equalized rather it was designed so that most work stations work for full cycle time with some allowance for rest and fatigue and other work stations had a fair amount of idle time. The space available at each work station did not allow the worker to produce the next item until the person succeeding him had physically moved it over to his work station. Slide 12: Work station was designed using ‘surgeon’ concept. All tools and parts were within one arm or leg movement from workers position on the line. Heavy physical work was minimized by use of over head cranes to lift and move heavy parts. Difficulties during implementation of JIT : Difficulties during implementation of JIT Negotiation with unions. 1. Employees were afraid they might have to work in harder and stricter work condition. 2. Retrenchment No prior experience with JIT Relatively new method Incentive problems Benefits were not clear Planning for implementation of JIT : Planning for implementation of JIT “The change required here is to treat each employee as a hole human being rather than as one with a very limited purpose.” – Mr. M.M. Lal They planned to provide competitive salaries, good working conditions, and intensive efforts for training of employees through manuals, cassettes and video, as a procedure for implementing change. Implementation and training : Implementation and training Formed core team of four engineers. Initially trained them for a month on JIT philosophy and technique. Implemented firstly at faridabad and then extended it to Prithampur, Alwar and H.P. plants Twelve workers were identified to work on the new line under JIT implementation program. These workers were trained by core team of engineers. Training- 1. Designed games in class room 2. Directly on line. Continued….. : Continued….. Workers were encouraged to write down the operating standers which specified the sequence of steps for each item on the assembly line going through his station. Eicher’s approach to incentives : Eicher’s approach to incentives Some times lower production was required so worker producing faster than the others in assembly line served no purpose Rewarding someone for working faster gave no meaning. It also Increased work in progress inventories. Looking the implication company abolished incentive system and bought new system for rewarding by negotiating with the worker unions. Indicators of Manufacturing Performance : Indicators of Manufacturing Performance Quality Percentage straight pass. Defects per unit. Demerit rating. Slide 20: Cost Inventory at various stages. Delivery Target achievement. Safety Measured by no. of accidents. Teamwork Extending JIT to suppliers : Extending JIT to suppliers JIT required appropriate quantities for production during shifts. For just in time inventory management the company used two types of supplier :- 1. Located far from the plant. low coordination because of distance 2. Local suppliers. Vendors using cycle, rickshaws to ship parts directly to the shop floor 2 to 3 times a shift Total quality control : Total quality control Production and quality systems: Product drawings were translated in to the assembly operations sheet. Quality standards were established by the quality planning and production people. Quality checks were carried out at three levels: Worker Supervisor Quality auditor Continued….. : Continued….. Worker checks every item coming in and coming out of his work station. Supervisor checks a sample of items once or twice a shift. Quality auditor checks a smaller samples once a day. Workers used simple methods, supervisor used bit more sophisticated methods like vernier calliper, auditor uses methods equivalent to supervisor. Finished products were inspected by quality control inspector. Total Employee Involvement : Total Employee Involvement The company believed that once the workers were properly trained and had imbibed spirit of TQM & JIT they were in the best position to observe and suggest improvements pertaining to there area of work . Company implemented the system to follow up on worker suggestions. Since empowerment and involvement were important so if a workers achievements were recognized his ability to contribute to increase Slide 26: It followed the employee recognitions system like giving gift of a pen in front of his colleagues. Indicators of Manufacturing Performance : Indicators of Manufacturing Performance Quality Percentage straight pass. Defects per unit. Demerit rating. Slide 30: Cost Inventory at various stages. Delivery Target achievement. Safety Measured by no. of accidents. Teamwork Thank you : Thank you

Add a comment

Related presentations

Related pages

Eicher :: Eicher Motors Limited :: Home

Eicher Motors Limited - Redefining the way people, goods and cargo move, leveraging world-class technology and our own passion for innovation!
Read more

Eicher – Wikipedia

Eicher war ein Hersteller von Traktoren, Landmaschinen und Motoren. Das Unternehmen wurde 1936 von den Brüdern Josef und Albert Eicher im oberbayerischen ...
Read more

Eicher Traktor eBay Kleinanzeigen

eBay Kleinanzeigen: Eicher Traktor, Kleinanzeigen - Jetzt finden oder inserieren! eBay Kleinanzeigen - Kostenlos. Einfach. Lokal.
Read more

Eicher Tractor - TAFE

Eicher Tractor. The Eicher brand of tractors are one of the oldest names in the industry, and with the all new and refreshing Eicher ‘E’ symbol, are a ...
Read more

Eicher Schlepper Angebote bei mobile.de

mobile.de: Eicher Schlepper kaufen. Finden Sie eine Vielzahl von günstigen Angeboten bei mobile.de - Deutschlands größter Fahrzeugmarkt
Read more

eicher in Traktoren und Schlepper für die Agrarindustrie ...

eicher ihc aus einer riesigen Auswahl an Traktoren und Schlepper für die Agrarindustrie finden. Tolle Angebote bei eBay!
Read more

Traktorenlexikon: Eicher – Wikibooks, Sammlung freier Lehr ...

Im Folgenden wird die Eicher-Geschichte bis in die Anfänge der Brüder Josef und Albert Eicher dargestellt.
Read more

Eicher Traktoren gebraucht - traktorpool.de - Der ...

Eicher Traktoren gebraucht kaufen bei traktorpool.de zu besten Preisen von professionellen Händlern und privaten Anbietern. Attraktive Angebote für ...
Read more

Eicher eBay Kleinanzeigen

eBay Kleinanzeigen: Eicher, Kleinanzeigen - Jetzt finden oder inserieren! eBay Kleinanzeigen - Kostenlos. Einfach. Lokal.
Read more

Eicher World | Driving Services For Everyone

We all plan on learning driving as soon we hit the lawful age to do so. We go through a lot of trouble to get that piece of paper in hand that will allow us to
Read more