CV Muh. Maknun_Rev.19_2016.03.17

40 %
60 %
Information about CV Muh. Maknun_Rev.19_2016.03.17

Published on March 17, 2016

Author: MuhammadMaknun1

Source: slideshare.net

1. CURRICULUM VITAECURRICULUM VITAE PERSONAL IDENTITY Name MOH. MAKNUN CHALID Weight/Height 74 kg / 169 cm Sex : Male Place/Date of Birth Jakarta, May 28 th , 1977 Marital Status : Married Religion Moslem Nationality : Indonesia Hobby Reading, badminton, listening music, traveling Permanent Address Jl. H. Mendik No. 52 RT 04/01 Gandul, Depok 16512 Phone Home: (021)7548622 Mobile: 0821 1472 7862 Email & URL E-mail: muhammad.maknun@gmail.com http://www.linkedin.com/pub/muhammad-maknun/25/681/48a TECHNICAL PROFICIENCIES (QUALIFICATION) Engineering Skills:  Familiar to review engineering drawings: PID, Plot Plan (Equipment Layout), Piping Plan, and Isometric.  Familiar to develop and review engineering documents for Mechanical and Piping: Specifications, data sheets, piping stress analysis (criteria and report), and mechanical calculations.  Able to design/review Plot Plan based on GAP standard for equipment spacing requirement.  Able to review 3D modeling (Navisworks).  Able to review TBE, Technical Query, ECR, and material selection for piping, valves, and fittings  Able to calculate CORROSION RATE and Corrosion Allowance from HMB data.  Able to design of Corrosion Monitoring System (Corrosion Coupon, ER, LPR, etc.) and its mitigation method (Cathodic Protection, Chemical Inhibitor, coating/wrapping, etc.)  Able to contribute in HAZID/HAZOP during FEED and detail engineering stage.  Have experience to develop rotating equipment maintenance task schedule at Pertamina UP IV Cilacap.  Familiar with international standard codes, such as: - Mechanical related: ASME VIII Div. 1 and Div. 2, API 650 - Piping related: ASME B31.3, ASME B31.4, ASME B31.8, ASME B16.5, ASME B16.34, API 598, API 607, API 608, ASTM, GAP (equipment spacing standard), etc.  Familiar to use Ms. Office (Excel for intermediate calculation) and engineering software, such as: AutoCAD, Compress (Pressure Vessel design), CAESAR II (piping stress analysis), and Navisworks. Construction Skills:  Able to review piping construction procedures. 1 of 6

2.  Able to develop daily Piping Progress Report/spool control.  Familiar to inspect piping installation based on GA/Piping Plan dwg. and isometric drawings. Pre-Commissioning and Commissioning Skills:  Able to review all Precomm. and Commissioning procedures (Hydrotest, Leak Test, Flushing/Blowing).  Able to contribute as team on all Pre-Commissioning and Commissioning activities, such as: Line Check, Hydrotest, Flushing/Blowing, Reinstatement (punch list activities), and Purging/Leak test.  Able to contribute SAT Mechanical Package system and Pump system. PERSONAL SKILLS  Have a good self-confidence, hard worker, loyal, honest & responsible  Strong motivated to learn  Have intuitive to solve problem  Able to divine the critical job to be handled firstly  Willing to relocated in all over Indonesia/ overseas  Able to work individually, and also good communicate in project team. FORMAL EDUCATION Name: Start: Finish: Major: Result: I. School Elementary : SD Negeri 423 Surabaya 1983 1989 General Junior High School: SMP Negeri 12 Jakarta Selatan 1989 1992 General Senior High School: SMA Negeri 6 Jakarta Selatan 1992 1995 Physic II. Institute/University Diploma (D3): Bandung Institute of Technology of Polytechnic (POLBAN) 1995 1999 Energy Audit GPA: 2.35 Engineer (S1): Sepuluh November Institute of Technology (ITS) Surabaya, Department of Mechanical Engineering 2000 2004 Energy Conversion GPA: 2.86 III. Final Project Title: “Operation Performance of Heat Exchanger of Multipurpose Reactor G.A. Siwabessy On 25 MW Heat Generation” (Politeknik ITB, 1999) Advisor: Ir. Ratna Budiawati, M.A. Ir. Sukmanto Dibyo, MSc. Point: B Title: “Energy and Exergy Analysis on Gas-Vapor Combined Cycle Power Plant on 501.8 MW Load at PLTGU Gresik” (ITS Surabaya, 2004) Advisor: Ir. Atok Setiawan, MEng. Point: AB TRAINING Institution: Duration: Specification: Certified: • POLMAN BANDUNG 3 months Mechanic Maintenance Yes 2 of 6

3. • PT. Klaras Pusaka Internasional (In-House) 1 months ASME Sect. VIII Div. 1 No • Ap-Greid Oil & Gas Design Course 6 days Pipe Stress Analysis (CAESAR II) No • Storage Tank Inspection (In-House) 6 days API Std. 650 and API Std. 620 No • Financial Risk Analysis Seminar 1 day Project Manag. Institute (PMI) Yes • Process Piping ASME B31.3 3 days Oil Institute Yes • Ap-Greid Oil & Gas Design Course 4 days CORROSION ENGINEERING Yes • Ap-Greid Oil & Gas Design Course 3 days Commissioning (Basic) Yes LANGUAGE SKILLS Languages Speak Read Write English Fairly Very Good Good WORKING EXPERIENCE Jan 2016 – Mar 2016: PT. TRANSTEK As Sr. PIPING ENGINEER – JOB PERTAMINA-MEDCO TOMORI SULAWESI (JOB PMTS) RESPONSIBILITIES: a. Contribute in closing punch list b. Review engineering documents and supervising in construction for new line of HP Fuel Gas to TOX c. Contribute in supervising inconstruction for re-line of closed drain d. Contribute in precomm. and commissioning for new line HP Fuel Gas to TOX and re-line of closed drain Jul 2011 – Dec 2015: PT. REKA PATRIA EKAGUNA (RPE) As Sr. PIPING ENGINEER – JOB PERTAMINA-MEDCO TOMORI SULAWESI (JOB PMTS) RESPONSIBILITIES: a. Review all Mechanical & Piping documents from FEED and detail engineering phase. b. Review 3D modeling and equipment layout regarding GAP standard for equipment spacing. c. Review RFQ, TQ, ECR and CCR from EPC Company. d. Contribute in HAZID/HAZOP during FEED and detail engineering phase. e. Calculate Pipeline and flowlines strength for material grade selection. f. Report piping fabrication and construction progress (dia-in welding progress and spool controlling). g. Contribute as team of Pre-Commissioning and Commissioning activities, such as: Line Check, Hydrotest, Flushing/Blowing, Reinstatement (punch list activities), and Purging/Leak test. EXPERIENCES GAINED: a. Optimizing in managing of equipment layout as per GAP international standard requirements. b. Experience in FEED, HAZID, and HAZOP activities. c. Experience in Pre-Commissioning and Commissioning activities. 3 of 6

4. d. Reporting in piping progress for fabrication and construction stage. Mar 2011 – Jun 2011: PT. IPEDEX (SPIE) As Sr. PIPING ENGINEER – JOB PERTAMINA-MEDCO TOMORI SULAWESI (JOB PMTS) RESPONSIBILITIES: a. Develop AFE and bid document for Mechanical and Piping scope, and submitted to SKK MIGAS. b. Generate Mechanical and Piping Deliverables and Man hours (CTR). EXPERIENCES GAINED: a. Cost estimate based on man hours (CTR) and for project budgetary. b. Develop Bid Plan document which required for EPC Company for estimate and planning the project. Jan 2011 – Feb 2011 : PT. CAHAYA MULTI DIMENSI As Sr. PROJECT PLANNING ENGINEER – MEDCO E&P INDONESIA SFE Dept. RESPONSIBILITIES: a. Develop bid documents required for upgrading Singa plant. b. Monitoring 3rd party as consultant for develop Feasibility Study for Membrane designing in Singa Plant. c. Supporting and give the assessment in mechanical and piping scope for development in existing plant/area of MEDCO, such as Block A area, Singa Plant, and Ilham Field (Oman). June 2008 – Dec 2010 : PT. REKAYASA ENGINEERING As MECHANICAL ENGINEER – Mechanical Dept. RESPONSIBILITIES: a. Develop mechanical engineering documents (Data Sheet, MTO, Specifications, RFQ, and TBE). b. Develop mechanical strength calculation for mech. equipments, such as: • Atmospheric Tank, as per code API 650, API 620, and API 12F • Pressure Vessel, as per code ASME VIII Div. 1 and/or Div. 2 • Pig Launcher/Receiver, as per code ASME VIII Div. 1 either ASME B31.8 • Heat Exchanger, as per code TEMA, and ASME I • Belt Conveyor calculation as per code JIS B8805 or CEMA • Flexowell conveyor calculation as per code JIS c. Pumps selection as per hydraulic calculation and process data sheet. d. Develop cost estimation for fabrication of static equipments and mechanical works. PROJECT EXPERIENCES: • Nov-09 – Aug-10: Urea Bulk Storage Expansion at PT. Pupuk Iskandar Muda (PIM), Lhokseumawe Nangroe Aceh Darussalam Job Description: a. Prepare FEED documents for material handling: MTO list, Data Sheets, Specifications, and RFQ. 4 of 6

5. b. Develop Basic Design for mode operation selected as per the most operating advantages, optimizing shutdown schedule and the cost required. c. Develop mechanical calculation for belt conveyor and flexowell conveyor. • Sep-08 – Jul-09 : as Mechanical Engineer for Onshore Small Project at ConocoPhillips Indonesia Inc. Ltd. Job Description: a. Preparing FEED documents: MTO list, Mechanical Data Sheet, and Mechanical Strength Calculation. b. Coordinating to Designer for develop engineering drawing. c. Generate the selection optimum sizing for mechanical static equipment. d. Develop cost estimation for Mechanical scope. List of Projects: - Ramba Kaji Pipeline Project (design for storage tank and pump system) - Additional Filter Coalescer for Suban - Suban New Storage Tank – FEL 1 Study - Engineering Design for Fuel Gas Heat Exchanger at Rawa – FEL 1 Study - Engineering Design for Amine Reboiler Waste Heat Recovery at Suban – FEL 1 Study • Jun-08 – Aug-08 : as Mechanical Engineer for Brunei Methanol Project at Mitsubishi Heavy Industries Ltd. May 2006 – May 2008 : PT. KLARAS PUSAKA INTERNASIONAL As PROJECT ENGINEER – EPC & Fabrication Dept. RESPONSIBILITIES: a. Develop engineering documents: MTO list, Technical Data Sheet, Calculation, Specifications, Procedures, Engineering Drawing, and cost estimate as per project requirements. b. Preparing project schedule, NDT Test Report, and material certificates from vendor. c. Develop FAT and Commissioning report and Instruction for Installation, Operation and Maintenance. EXPERIENCES GAINED: a. Experience in develop engineering documents and estimate project cost. b. Experience in develop project procedures and test reports: Hydrotest, NDT, Surface Preparation and Painting, FAT, Pre-commissioning and Commissioning. c. Experience in supervision on fabrication works. PROJECT EXPERIENCES: • Project for “Hydrate Inhibitor Injection Package” project at Star Energy, Ltd. • Project for “Chemical Injection Package” project at Star Energy, Ltd. May 2005 – May 2006 : PT. KLARAS PUSAKA INSTRUMINDO As MAINTENANCE SERVICE ENGINEER – MRA Dept. RESPONSIBILITIES: - Develop maintenance task schedule and overhaul details for rotating equipment based on Condition 5 of 6

6. Based Maintenance (CBM) techniques. - Assist on inspection task and report unusual condition on operating of rotating equipments. - Check and identifying the vibration on rotating equipment. - Assist on setup weekly inspection report of rotating equipment with recommendation act. EXPERIENCES GAINED: - Able to develop maintenance schedule (planning) for rotating equipment based on CBM techniques. - Able to lead reliability improvement projects and maintenance program for Mechanical equipment. - Provide Mechanical Engineering advice and support to maximize operations. - Software: Cwork (maintenance management software), MOVIPACK (vibration analyzer) + eDiag software from 01dB-Steel. ACCOMPLISHMENT: - Completing Preventive Maintenance Planning at Pertamina UP IV Cilacap leading the schedule (only 10 months from 12 months scheduled) with no major comment from client. PROJECT EXPERIENCES: • Jan 2005 – February 2006: Preventive Maintenance Task List and Inspection for Rotating Equipment at Pertamina UP IV Cilacap • March – May 2006: Condition Monitoring Service for rotating equip. at PT. AJINOMOTO – Mojokerto I declare the details stated to be true and complete, finally I would like to say thank you for your attention. I’ll be appreciated if you’ve saved this application when didn’t comply with your requirement. I truly will be match on next opportunity. Yours truly, Muh. Maknun Chalid 6 of 6

7. Based Maintenance (CBM) techniques. - Assist on inspection task and report unusual condition on operating of rotating equipments. - Check and identifying the vibration on rotating equipment. - Assist on setup weekly inspection report of rotating equipment with recommendation act. EXPERIENCES GAINED: - Able to develop maintenance schedule (planning) for rotating equipment based on CBM techniques. - Able to lead reliability improvement projects and maintenance program for Mechanical equipment. - Provide Mechanical Engineering advice and support to maximize operations. - Software: Cwork (maintenance management software), MOVIPACK (vibration analyzer) + eDiag software from 01dB-Steel. ACCOMPLISHMENT: - Completing Preventive Maintenance Planning at Pertamina UP IV Cilacap leading the schedule (only 10 months from 12 months scheduled) with no major comment from client. PROJECT EXPERIENCES: • Jan 2005 – February 2006: Preventive Maintenance Task List and Inspection for Rotating Equipment at Pertamina UP IV Cilacap • March – May 2006: Condition Monitoring Service for rotating equip. at PT. AJINOMOTO – Mojokerto I declare the details stated to be true and complete, finally I would like to say thank you for your attention. I’ll be appreciated if you’ve saved this application when didn’t comply with your requirement. I truly will be match on next opportunity. Yours truly, Muh. Maknun Chalid 6 of 6

Add a comment