advertisement

capex presentation 30 nov

57 %
43 %
advertisement
Information about capex presentation 30 nov
Entertainment

Published on February 11, 2008

Author: Margherita

Source: authorstream.com

advertisement

MITTAL STEEL SOUTH AFRICA CAPITAL PROJECTS INFORMATION DAY :  MITTAL STEEL SOUTH AFRICA CAPITAL PROJECTS INFORMATION DAY Programme – 30 November 2005 10:00 – 10:15 Opening and welcoming by the CEO 10:15 – 10:45 Presentation by General Manager, Procurement & Logistics 10:45 – 11:15 Presentation by Manager, Relines 11:15 – 12:00 Closure by General Manager, Procurement & Logistics Today’s discussion:  Today’s discussion Mittal Steel South Africa Strategic Goals and Throughput Strategy Overview of Capital Projects planned by Mittal Steel South Africa Limited (2006 – 2010) Blast Furnace D Reline 2006 BEE and areas of concern Strategic Goals and Throughput Strategy of Mittal Steel South Africa:  Strategic Goals and Throughput Strategy of Mittal Steel South Africa Strategic Goals:  Strategic Goals Industry leading value-creation for our shareholders - Positive EVA over the cycle Improve operating Capabilities - Value-creating throughput increases of 2 Mtpa - 20% reduction in HRC/billet cash cost by 2007 Build a high performance culture - Create an environment that generates true employee pride & attracts, develops & retains top-performing people Be a responsible corporate citizen Throughput Strategy:  Throughput Strategy Increase production by – 1,5 Mtpa by end 2007 with initial capex - 325 ktpa – 2 new DRI kilns at Vanderbijlpark by 2H/07 - 660 ktpa – efficiency improvements by 2H/06 - 445 ktpa – Blast furnace D reline at Vanderbijlpark by 2H/06 - Expand sinter capacity at Vanderbijlpark by 1H/08 Utilize opportunities to increase throughput by further – 1Mtpa with capital expenditure - 505 ktpa – Additional DRI kilns at Vanderbijlpark by 2H/09 - 355 ktpa – Blast Furnace C reline at Vanderbijlpark by 2012 - 105 ktpa – Smaller capital projects at Saldanha and Vereeniging Rationalization of other facilities to follow Overview of Capital Projects planned by Mittal Steel South Africa Limited (2006 – 2010) :  Overview of Capital Projects planned by Mittal Steel South Africa Limited (2006 – 2010) Distribution per Geographical area:  Distribution per Geographical area Vanderbijlpark Steel:  Vanderbijlpark Steel An overview of the projects planned at Vanderbijlpark Steel is the following: 30 Projects > R 20m 17 Projects R10m to R20m 200 Projects < R10m Saldanha Steel:  Saldanha Steel An overview of the projects planned at Saldanha Steel is the following: 8 Projects > R20m 5 Projects R10m to R 20m 90 Projects < R10m Newcastle Steel :  Newcastle Steel An overview of the projects planned at Newcastle Steel is the following: 14 Projects > R20m 11 Projects R10m to R 20m 80 Projects < R10m Vereeniging Steel:  An overview of the projects planned at Vereeniging Steel is the following: 6 Projects > R20m 4 Projects R10m to R 20m 110 Projects < R10m Vereeniging Steel Mittal Coke & Chemicals:  Mittal Coke & Chemicals An overview of the projects planned at Mittal Coke & Chemicals is the following: 2 Projects > R20m 5 Projects R10m to R 20m 96 Projects < R10m Overview on 2 new DRI Kilns 5 & 6 and additional sinter strand :  Overview on 2 new DRI Kilns 5 & 6 and additional sinter strand Kiln 5 & 6 Project Scope The project is an integral part of our expansion strategy and consists of five main components::  Kiln 5 & 6 Project Scope The project is an integral part of our expansion strategy and consists of five main components: Material Handling Raw Materials Handling Product Handling Ash Handling Kiln and Cooler Proper (2 off) 80 m Kiln, 4.8 m diam 50 m Cooler, 3.2 m diam After Burner Chamber (ABC) and Dust Settling Chamber (DSC) Various bought out items: fans,motors,gearboxes,pumps…. 66 Bar Waist Heat Boilers (2 off) Electrostatic Precipitators (2 off) Power Plant (Turbo Alternator Set) Kiln 5 & 6 Project Activities:  Kiln 5 & 6 Project Activities Design Project Management of total or portions of project Site establishment Civil Construction Electrical supply and control equipment Various bought out items: fans, motors, gearboxes, pumps…. Erection of buildings, kiln and coolers, Boilers, ESP Transport and cranes Sinter Upgrade Project Scope This project is an integral part of the expansion strategy and consists of the following elements.:  Raw Material Handling Extend Fine Material Blending bed by 150 m Install new Tippler Install raw material buffer facility New conveyors ca 2500 m Sinter Plant proper 159 m² Sintering area, 130 pallet cars Off strand rotary Cooler Extend cold screening, crushers and screens 4 x 400 m3 steel bins and mixing drum Various bought out items: fans,motors,gearboxes,pumps…. Install extra power supply capacity ca 20 MWh Sinter Upgrade Project Scope This project is an integral part of the expansion strategy and consists of the following elements. Blast Furnace D Reline 2006:  Blast Furnace D Reline 2006 Blast Furnace D Reline 2006:  Blast Furnace D Reline 2006 Index Objective of reline Background Overview of scope Blast Furnace D Reline 2006 Objective of Reline:  Blast Furnace D Reline 2006 Objective of Reline Campaign life of +20 years. Minimum downtime - 90 days. Production capacity – 5700tHM/day after sinter plant increased production. An improved hot metal quality level and lower standard deviation with respect to hot metal silicon, sulphur and temperature. Increased availability Blast Furnace D Reline 2006 Background:  Blast Furnace D Reline 2006 Background Blast Furnace D was relined in 1990 and since then it has received 3 intermediate repairs In 1997 the refractory material in the hearth walls, the bosh, the belly of the furnace, and the ceramic burners in all hot blast stoves were replaced In 2000 the refractory material in the lower shaft, the throat armour, part of the furnace shell and three segments of the bustle pipe were replaced In 2004 the cooling elements in the lower shaft were replaced with staves, the furnace was shotcreted, a water cooled under hearth system was installed and the Paul Wurth gearbox was replaced Blast Furnace D Reline 2006 Background:  Blast Furnace D Reline 2006 Background The project will be handled in the following phases: Phase 0 Conceptual study – completed Phase 1 Fixing of scope and budget - completed Phase 2 Engineering and procurement - present Phase 3 Reline – start 1 July 2006 Phase 4 Project closure Blast Furnace D Reline 2006 Overview of Scope:  Blast Furnace D Reline 2006 Overview of Scope Stockhouse and Furnace Charging Furnace Proper Casthouse Raw Gas System Electrical, Instrumentation & Control Blast Furnace D Reline 2006 Overview of Scope:  Blast Furnace D Reline 2006 Overview of Scope Stockhouse and Furnace Charging Refurbish existing equipment Increase coke storage capacity from 5 hours to 12 hours Replace the redundant skip charging system with a conveyor charging system Install an additional dust extraction system Blast Furnace D Reline 2006 Overview of Scope:  Blast Furnace D Reline 2006 Overview of Scope Furnace Proper Replace the complete furnace shell as the existing bottom plate is cracked Replaced the furnace hearth refractory material Install a copper and cast iron staves cooling system Install a closed cooled water system Replace damaged uptakes Replace the bustle main on a new elevation Blast Furnace D Reline 2006 Overview of Scope:  Blast Furnace D Reline 2006 Overview of Scope Casthouse Increase the length of the iron troughs The cast house floor will be leveled for mobile access Install a ramp from ground level to the cast house floor Install air cooled troughs Install a new tuyere platform Install new slag runners to accommodate a new casthouse layout Blast Furnace D Reline 2006 Overview of Scope:  Blast Furnace D Reline 2006 Overview of Scope Raw Gas System Replace the primary dust catcher internal trumpet Replace the dust discharge equipment Refurbish the existing gas scrubber Install a new cooling tower Blast Furnace D Reline 2006 Overview of Scope:  Blast Furnace D Reline 2006 Overview of Scope Electrical, Instrumentation & Control Supply new electrical system for all new equipment Refurbish existing electrical systems BEE and Areas of Concern:  BEE and Areas of Concern BEE Policy :  BEE Policy Realising that Black Economic Empowerment (BEE) are the cornerstone of a strong and sustainable economy, Mittal Steel South Africa Ltd commits itself to actively support and contribute to the development and growth of BEE’s in the Republic of South Africa. We believe that the active development and the participation of BEE’s will ensure broad based growth of the economy and the achievement of sustainable development, job creation and general prosperity in our country. A BEE policy is in place that will enable Mittal Steel South Africa Ltd and its employees the opportunity to contribute effectively to a better South Africa. Mittal Steel South Africa Ltd commits itself to pursue and actively promote this process. The objectives of the BEE policy :  To facilitate access of BEE Vendors, to Mittal Steel South Africa Ltd procurement activities To contribute to development and growth of BEE To establish, monitor and report progress against annual targets – for goods/services procured To encourage major non-BEE vendors to establish and implement BEE initiatives The following shall not be compromised in the process of giving effect to this policy: The expertise and experience of persons supplying services The specifications and quality of goods to be supplied Delivery reliability Pricing The objectives of the BEE policy BEE Management:  BEE Management Preferential treatment of BEE vendors: In the process of awarding tenders by Mittal Steel South Africa Ltd, preference shall be given to BEE Vendors who meet all the tender requirements. Mittal Steel South Africa Ltd spend R1,023 Billion on BEE suppliers in 2004 Projected spend on BEE suppliers for 2005 will be R 1,615 Billion During 2006 Mittal shall align its supplier database with the new codes of Good Practice as determined by the DTI Areas of Concern:  Areas of Concern General skills shortage in the country due to Engineers and artisans seeking international employment during the last 10 years Infrastructure and other expansion projects in South Africa sucking up most of the Engineering, Project Management and Manufacturing Capacity Delivery Reliability – due to the tight deadlines, commitments to equipment delivery and commissioning of projects must be adhered to at all times Sub-contracting of work – Mittal Steel SA Ltd conduct business with reliable vendors that are capable of rendering a quality, affordable and timely service. In the event of subcontracting work, main contractors should verify the capabilities of sub-contractors to perform the work Safety of contractors high activity at the business units due to capital expansions leads to a higher safety risk. Proof of section 16.1 or 16.2 responsible person appointments in terms of the OSHACT is compulsory

Add a comment

Related presentations

Related pages

Capex Presentation - libs9.lejoguide.com

capex presentation 30 nov, SlideSearchEngine.com capex presentation 30 nov Entertainment presentation by Margherita MITTAL STEEL SOUTH
Read more

presentation SG 30 nov 2011 - Arkema.com

Recurring capex: €360m 4Q’11 cash flows will include: Cash outs related to an investment in a fluorspar mine ... presentation_SG_30_nov_2011 () ...
Read more

Corporate Presentation November 2014 - Husky Energy

Corporate Presentation November 2014 •Balanced growth strategy delivering ... Based on actual results as of September 30, 2014 Pikes Peak South
Read more

Capital Power Investor Presentation - Nov 2014 V2

CAPITAL POWER Investor Meetings ... 0 10 20 30 40 50 60 Genesee 2 Genesee 1 ... Total non-fuel O&M and CAPEX spending excluding planned outages(1)
Read more

Investor Presentation November 2013

Investor Presentation November 2013 ... 30 50 60 2008 2009 2010 2011 ... 2013 Capex Guidance $670 $430 $200 $300 $400 $500 $600 $700 $800 $900
Read more

Impax Laboratories Lenders Presentation Nov 13 2014 [Read ...

This presentation contains forward-looking EBITDA, ... Impax CorePharma Acq. 9/30/14 ... CapEx 33 3 36 Secured Debt ...
Read more

Investor Presentation November 2013 - s1.q4cdn.com

This presentation has been prepared by, and is the sole responsibility of, the Company. This document, any presentation made in conjunction
Read more