alts adds presso

50 %
50 %
Information about alts adds presso
Entertainment

Published on November 7, 2007

Author: Haylee

Source: authorstream.com

BASIX Alterations + Additions :  June 2006 BASIX Alterations + Additions Alterations & Additions policy:  Alterations & Additions policy Objective: To require renovations to include practical measures that will reduce greenhouse gas emissions and potable water consumption. Alterations & Additions policy:  Alterations & Additions policy Will operate as part of the existing website; Sets simple, specific conditions, based on the intended work; Only applies to the sections of the home that are being renovated; Relevant BASIX commitments must be shown on plans Existing Policies:  Existing Policies BASIX will override all energy and water efficiency policies presently applied to residential development by councils. For example: Requirements for raintanks, solar water heaters; Insulation and shading requirements; Existing Energy Smart Homes policy components. What it means for Councils:  What it means for Councils Ensure BASIX Certificate accompanies BASIX-affected Alterations and Additions DAs/CDCs; Check plans for appropriate marking of BASIX commitments: Rainwater tank – with size stated Pool / spa covers Pool / spa pumps and heating systems Water heater type Lighting Added insulation, glazing, shading What it means for Councils:  What it means for Councils Ensure BASIX commitments delivered at construction stage, evidenced by visual inspection and/or; third-party certification. Implementation:  Implementation Examples of projects that will require a BASIX Certificate (assuming a DA or CDC is required): Extensions of living areas, bedrooms, bathrooms, kitchens; New living areas, bedrooms, bathrooms, kitchens, on a dwelling site (eg. a new, freestanding enclosed pavilion); Modifications to the building fabric of an existing dwelling; New swimming pools and/or outdoor spas; New hot water systems. Implementation:  Implementation It is NOT the intent to require a BASIX Certificate for the following: New garages or carports New structures that cannot be fully enclosed, e.g. gazebos New pergolas, verandahs or shading devices such as awnings, where they are the only development proposed DA/CDC for only a solar hot water system How will it work?:  How will it work? The user enters relevant project details How will it work?:  How will it work? How will it work?:  How will it work? How will it work?:  How will it work? How will it work?:  How will it work? How will it work?:  How will it work? BASIX provides prescriptive requirements for Water, Energy and Thermal Comfort – there are no targets; How will it work?:  How will it work? How will it work?:  How will it work? Once all requirements have been met, a BASIX Certificate can be printed; Plan Marking:  Plan Marking BASIX requirements must be marked on plans: Insulation types/R-Values; All wall, floor, ceiling and roof construction types; All glazing and frame types; Shading devices and overshadowing objects; Raintanks – location and capacity in litres; Rainwater/stormwater collection areas in m2; Hot water system type and location; Pools + Spas:  Pools + Spas Average pool size in NSW is 48,700 litres; Homes with pools have an additional 10% water consumption above the average; Increased water usage is due to evaporation, splash and backwash; Increased energy usage isdue to pool pump and heating; NSW Health supports rainwater tanks for topping up swimming pools. Pools:  Pools BASIX requirements are set depending on pool type and location. They may include: Filter pump timer Cover Shading Rainwater tank for top-up Pools:  Pools Rainwater tank size varies according to: Location / climate Pool size Roof catchment area Heating type Use of cover The tap must be within 10 metres of the pool; For large, unheated pools, installing a cover and/or shading will reduce rainwater tank size. Pools and Spas:  Pools and Spas Pools & Spas:  Pools & Spas Water:  Water Minimum requirements: 3* for new basin taps (excluding bath and laundry), showerheads, and toilets; Rainwater tank for new pool/outdoor spa in most locations; Pool cover if pool is heated. Raintank size required is determined by: Roof capture area; Location; Installation of pool heating; Installation of a pool cover. Energy:  Energy Proposed minimum requirements: Lights must be energy efficient (e.g. fluorescent); Solar, heat-pump, gas storage or gas instantaneous hot water systems if being replaced; Day/night zoning for new A/C system; Timer on pool filter pump; Electric resistance pool heating not permitted. Slide25:  Insulation required for new: Suspended floors; External walls; Ceilings; Roofs, if they are dark or medium colour. Thermal Comfort Slide26:  First Floor Addition – North coast climate zone Slide27:  To pass: 3* for new basin taps and showerhead in bath Energy efficient lighting New hot water system - solar Day/night zoning for new A/C system Insulation in new external walls, ceilings and roof 750mm eaves on north 750mm eaves plus toned glass to E & W – bed 2, or external louvres with clear glass 3m roof overhang to W bed 3, therefore no toned glass First Floor Addition – North coast climate zone Slide28:  Sustainability Unit, NSW Department of Planning BASIX Help Line 1300 650 908 help@basix.nsw.gov.au www.basix.nsw.gov.au

Add a comment

Related presentations

Related pages

Nescafé presso presso Werbung 1993 - YouTube

Nescafé presso presso Werbung 1993 ... alte Werbung Werbeblock Sat.1 1993 - Duration: ... Sign in to add this to Watch Later
Read more

Cristian Alexandru Radu | LinkedIn

Cristian Alexandru Radu. Consulente Assembly Data System presso Ericsson. Location Latina Area, Italy Industry Information Technology and Services
Read more

Ristorante Zirmstube presso Posta Zirm Hotel, Corvara in ...

Ristorante Zirmstube presso Posta Zirm Hotel, Corvara in Badia: See 109 unbiased reviews of Ristorante Zirmstube presso Posta Zirm Hotel, rated ...
Read more

Meca Stuttgart Isse'presso Gerlaunti - Google+

Meca Stuttgart Isse'presso Gerlaunti. ... Add a comment... Meca Stuttgart Isse'presso Gerlaunti ... (tawlk---alt kw) ...
Read more

Top 10 Chiara Carlini profiles | LinkedIn

Chiara Carlini. Social Media Marketing Intern, Back Office Executive presso ADS Assembly Data System S.p.A. Location Italy Industry Telecommunications
Read more

Gianluca Cappellini - Google+

Gianluca Cappellini - Pilota e istruttore di pilotaggio con la passione per la fotografia - Ciao sono Gianluca Cappellini, pilota e istruttore di ...
Read more

All-Clad Presso - the minimalist pour over espresso ...

All-Clad Presso - the minimalist pour over espresso machine. ... the minimalist pour over espresso machine. ... Feel free to add this to your signature line.
Read more

Ez Presso | ReverbNation

Ez Presso R&B/Soul Nizhny Novgorod, RU Save Remove from Library. Saved. Receive Updates? Yes. No. Share Artist; Share; Become A Fan. Songs. Play All ...
Read more

allenamento portieri asd savio calcio roma palle alte.AVI ...

palle alte presso il centro sportivo raimondo vianello asd savio calcio roma.
Read more

Fernando Buccolieri - Google+

Add a comment... Fernando ... Emanuele Buccolieri ed Ercole Pancrazio Buccolieri Registrato mixato e masterizzato da Angelo Emanuele Buccolieri presso ...
Read more