2012 FLIGHT PLAN CONTENT CHANGES

71 %
29 %
Information about 2012 FLIGHT PLAN CONTENT CHANGES

Published on February 6, 2009

Author: aulger

Source: slideshare.net

Description

http://havatrafik.blogspot.com/

2012 FLIGHT PLAN CONTENT CHANGES 2 nd DMEAN Flight Planning Workshop – 29 October 2008 Cay Boquist EUROCONTROL DAP/APN/ATMP

FPLSG/1 2004 ANC 164-5 23 October 2003 BACKGROUND Approved 27/5 2008 State letter 08/50 Overview

Item composition unchanged No change to the FPL form SCOPE OF AMENDMENT Instructions for completion of FPL Syntax changes in Item 10 General

Item 10 b) increase from 2 to max 20 characters Digits allowed in Item 10 a & b ITEM 10 Syntax changes

ITEM 10 a) COM/NAV/APP equipment and capabilities GBAS and LPV (A and B) ACARS (E1 - E3) CPDLC (J1 - J7) SATCOM (M1 - M3) RCP (P1 - P9 reserved)

COM/NAV/APP equipment and capabilities

GBAS and LPV (A and B)

ACARS (E1 - E3)

CPDLC (J1 - J7)

SATCOM (M1 - M3)

RCP (P1 - P9 reserved)

ITEM 10 a) COM/NAV/APP equipment and capabilities PBN approved (R + Item 18) RVSM approved (W) MNPS approved (X) VHF 8.33 capability (Y)

COM/NAV/APP equipment and capabilities

PBN approved (R + Item 18)

RVSM approved (W)

MNPS approved (X)

VHF 8.33 capability (Y)

ITEM 10 b) SUR equipment and capabilities Mode S – 3 new descriptors (total 7) ADS-B – 6 new descriptors (total 6) ADS-C – 2 new descriptors (total 2)

SUR equipment and capabilities

Mode S – 3 new descriptors (total 7)

ADS-B – 6 new descriptors (total 6)

ADS-C – 2 new descriptors (total 2)

ITEM 18 Change in order and new STS, PBN , NAV, COM, DAT, SUR , DEP, DEST, DOF , REG, EET, SEL, TYP, CODE, DLE , OPR, ORGN , PER , ALTN, RALT, TALT , RIF, RMK

Change in order and new

STS, PBN , NAV, COM, DAT, SUR , DEP, DEST, DOF , REG, EET, SEL, TYP, CODE, DLE , OPR, ORGN , PER , ALTN, RALT, TALT , RIF, RMK

ITEM 18 STS 13 descriptors for special handling included PBN 24 different descriptors included (max 8 entries = 16 characters) NAV Other than specified under PBN COM COM not specified in Item 10 a) DAT Data applications not specified in Item 10 a) SUR Surveillance applications not specified in Item 10 b)

STS

13 descriptors for special handling included

PBN

24 different descriptors included (max 8 entries = 16 characters)

NAV

Other than specified under PBN

COM

COM not specified in Item 10 a)

DAT

Data applications not specified in Item 10 a)

SUR

Surveillance applications not specified in Item 10 b)

ITEM 18 DOF Maximum 120 hours before EOBT DLE En route delay or holding ORGN Originators contact details (as required by ATS authority) PER Aircraft performance data TALT Take-off alternate (s)

DOF

Maximum 120 hours before EOBT

DLE

En route delay or holding

ORGN

Originators contact details (as required by ATS authority)

PER

Aircraft performance data

TALT

Take-off alternate (s)

QUESTIONS

Add a comment

Related presentations

Related pages

ICAO Flight Planning Amendment 1 - 2012

FPL 2012 – Generic training V1.0 1 ICAO Flight Planning Amendment 1 - 2012 Training Module ICAO Flight Plan Form Changes
Read more

Proposed 2012 Flight Planning Guidance - Airservices

ICAO Amendment 1 - Australian Flight Planning Guidance . Amendment 1 to the 15th Edition of ICAO Doc. 4444 introduces changes to useable identifiers and ...
Read more

EUROCONTROL Flight Plan 2012 Web Based Training ...

Preface Introduction The Changes The Formats Links FLIGHT PLAN ICAO 2012 Flight Planning modifications Dedicated to the European Flight Planning System (FPS)
Read more

Changes to the PRESENT flight Plan form - icao.int

• ICAO 2012 Impacts • Changes to the flight Plan Form ... changes to the length and content of items. • Amendment 1 does not specifically change the
Read more

ICAO 2012 - FltPlan.com Flight Planning & Flight Tracking ...

The International Civil Aviation Organization (ICAO) has agreed to make changes to the content and format of the ICAO flight plan form. These changes ...
Read more

Information for Operators - Federal Aviation Administration

Information for Operators . ... 2012 the ICAO flight plan content ... This InFO outlines the importance of accurate flight plan filing and the changes ...
Read more

aic a 006 12 DRAFT - Austro Control

the ICAO flight plan form (FPL). These changes become ... appropriate flight plan content and format ... then to "FPL 2012 ICAO EUR Region Plan" and then ...
Read more

ICAO FPL 2012 - knowledge and full support available ...

The worldwide implementation of ICAO Flight Plan changes will take place on 15 ... knowledge and full support available. ... [to flight plan content] ...
Read more

ICAO FPL 2012 | Eurocontrol

... the ICAO FPL 2012 switchover in ... ICAO Flight Plan changes take effect this week on 15 November 2012. The amendments to flight plan content go ...
Read more