Slide1: MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR  Education / Experience  Modular Configuration  Chamber Design  Chamber Time Line Estimate November 2007 Mark A. Laurenti  Chamber Cost Estimate Slide2: MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Homestake (1983 – 2001) Shaftman Contract Miner Mine Engineer Underground Mine Foreman Underground Chief Engineer Underground Chief Engineer Surface Technical Services Superintendent Mark A. Laurenti November 2007 Mark Laurenti Vulcan Materials (2001 – Present) Underground Project Design & Construction Manager Underground Plant Manager McCook Reservoir (TARP) Project Manager Education BS Mine Engineering (SDSM&T 1983) MBA (University of SD 2001) Slide3: MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Mark A. Laurenti November 2007  Chamber Design Controlled Blasting in Chamber Could use Instrumented Cables for Engineering / Geotechnical Study Slide4: MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Mark A. Laurenti November 2007  Chamber Design Note ! 3 Chambers Drilled in Costing Slide5: MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Mark A. Laurenti November 2007  Modular Configuration Slide6: MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Mark A. Laurenti March 2007  Modular Configuration Slide7: MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Mark A. Laurenti November 2007  Chamber Time Line Estimate General Parameters Slide8: MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Mark A. Laurenti November 2007  Chamber Time Line Estimate Design (3) 7 Months Site Set up (6) 9 Months Excavate Chamber (1) 61 months 3 Chambers drilled 6 Chambers Accessed 1 Chambers Mined Slide9: MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Mark A. Laurenti November 2007 Slide10: MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Mark A. Laurenti November 2007 Slide11: MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Mark A. Laurenti November 2007
Add a comment